Edit

Share via


_Global.ValidateGraphicalIndicators(Int32, String, Boolean) Method

Definition

public string ValidateGraphicalIndicators(int propertyID, string strGraphicalIndicators, bool Localized = false);
abstract member ValidateGraphicalIndicators : int * string * bool -> string
Public Function ValidateGraphicalIndicators (propertyID As Integer, strGraphicalIndicators As String, Optional Localized As Boolean = false) As String

Parameters

propertyID
Int32
strGraphicalIndicators
String
Localized
Boolean

Returns

Applies to