ApplicationClass.DocSize(Object, Object, Object) Method
Definition
Important
Some information relates to prerelease product that may be substantially modified before it’s released. Microsoft makes no warranties, express or implied, with respect to the information provided here.
public virtual bool DocSize(object Width, object Height, object Points);
abstract member DocSize : obj * obj * obj -> bool
override this.DocSize : obj * obj * obj -> bool
Public Overridable Function DocSize (Optional Width As Object, Optional Height As Object, Optional Points As Object) As Boolean
Parameters
- Width
- Object
- Height
- Object
- Points
- Object