PjField Enum
Definition
Important
Some information relates to prerelease product that may be substantially modified before it’s released. Microsoft makes no warranties, express or implied, with respect to the information provided here.
public enum class PjField
[System.Runtime.InteropServices.Guid("DD3D3A50-919A-11CF-982C-00AA00322803")]
public enum PjField
type PjField =
Public Enum PjField
- Inheritance
-
PjField
- Attributes
Fields
| Name | Value | Description |
|---|---|---|
| pjTaskWork | 188743680 | |
| pjTaskBaselineWork | 188743681 | |
| pjTaskActualWork | 188743682 | |
| pjTaskWorkVariance | 188743683 | |
| pjTaskRemainingWork | 188743684 | |
| pjTaskCost | 188743685 | |
| pjTaskBaselineCost | 188743686 | |
| pjTaskActualCost | 188743687 | |
| pjTaskFixedCost | 188743688 | |
| pjTaskCostVariance | 188743689 | |
| pjTaskRemainingCost | 188743690 | |
| pjTaskBCWP | 188743691 | |
| pjTaskBCWS | 188743692 | |
| pjTaskSV | 188743693 | |
| pjTaskName | 188743694 | |
| pjTaskNotes | 188743695 | |
| pjTaskWBS | 188743696 | |
| pjTaskConstraintType | 188743697 | |
| pjTaskConstraintDate | 188743698 | |
| pjTaskCritical | 188743699 | |
| pjTaskDelay | 188743700 | |
| pjTaskLevelDelay | 188743700 | |
| pjTaskFreeSlack | 188743701 | |
| pjTaskTotalSlack | 188743702 | |
| pjTaskID | 188743703 | |
| pjTaskMilestone | 188743704 | |
| pjTaskPriority | 188743705 | |
| pjTaskSubproject | 188743706 | |
| pjTaskBaselineDuration | 188743707 | |
| pjTaskActualDuration | 188743708 | |
| pjTaskDuration | 188743709 | |
| pjTaskDurationVariance | 188743710 | |
| pjTaskRemainingDuration | 188743711 | |
| pjTaskPercentComplete | 188743712 | |
| pjTaskPercentWorkComplete | 188743713 | |
| pjTaskFixedDuration | 188743714 | |
| pjTaskStart | 188743715 | |
| pjTaskFinish | 188743716 | |
| pjTaskEarlyStart | 188743717 | |
| pjTaskEarlyFinish | 188743718 | |
| pjTaskLateStart | 188743719 | |
| pjTaskLateFinish | 188743720 | |
| pjTaskActualStart | 188743721 | |
| pjTaskActualFinish | 188743722 | |
| pjTaskBaselineStart | 188743723 | |
| pjTaskBaselineFinish | 188743724 | |
| pjTaskStartVariance | 188743725 | |
| pjTaskFinishVariance | 188743726 | |
| pjTaskPredecessors | 188743727 | |
| pjTaskSuccessors | 188743728 | |
| pjTaskResourceNames | 188743729 | |
| pjTaskResourceInitials | 188743730 | |
| pjTaskText1 | 188743731 | |
| pjTaskStart1 | 188743732 | |
| pjTaskFinish1 | 188743733 | |
| pjTaskText2 | 188743734 | |
| pjTaskStart2 | 188743735 | |
| pjTaskFinish2 | 188743736 | |
| pjTaskText3 | 188743737 | |
| pjTaskStart3 | 188743738 | |
| pjTaskFinish3 | 188743739 | |
| pjTaskText4 | 188743740 | |
| pjTaskStart4 | 188743741 | |
| pjTaskFinish4 | 188743742 | |
| pjTaskText5 | 188743743 | |
| pjTaskStart5 | 188743744 | |
| pjTaskFinish5 | 188743745 | |
| pjTaskText6 | 188743746 | |
| pjTaskText7 | 188743747 | |
| pjTaskText8 | 188743748 | |
| pjTaskText9 | 188743749 | |
| pjTaskText10 | 188743750 | |
| pjTaskMarked | 188743751 | |
| pjTaskFlag1 | 188743752 | |
| pjTaskFlag2 | 188743753 | |
| pjTaskFlag3 | 188743754 | |
| pjTaskFlag4 | 188743755 | |
| pjTaskFlag5 | 188743756 | |
| pjTaskFlag6 | 188743757 | |
| pjTaskFlag7 | 188743758 | |
| pjTaskFlag8 | 188743759 | |
| pjTaskFlag9 | 188743760 | |
| pjTaskFlag10 | 188743761 | |
| pjTaskRollup | 188743762 | |
| pjTaskCV | 188743763 | |
| pjTaskProject | 188743764 | |
| pjTaskOutlineLevel | 188743765 | |
| pjTaskUniqueID | 188743766 | |
| pjTaskNumber1 | 188743767 | |
| pjTaskNumber2 | 188743768 | |
| pjTaskNumber3 | 188743769 | |
| pjTaskNumber4 | 188743770 | |
| pjTaskNumber5 | 188743771 | |
| pjTaskSummary | 188743772 | |
| pjTaskCreated | 188743773 | |
| pjTaskSheetNotes | 188743774 | |
| pjTaskUniquePredecessors | 188743775 | |
| pjTaskUniqueSuccessors | 188743776 | |
| pjTaskObjects | 188743777 | |
| pjTaskLinkedFields | 188743778 | |
| pjTaskResume | 188743779 | |
| pjTaskStop | 188743780 | |
| pjTaskResumeNoEarlierThan | 188743781 | |
| pjTaskOutlineNumber | 188743782 | |
| pjTaskDuration1 | 188743783 | |
| pjTaskDuration2 | 188743784 | |
| pjTaskDuration3 | 188743785 | |
| pjTaskCost1 | 188743786 | |
| pjTaskCost2 | 188743787 | |
| pjTaskCost3 | 188743788 | |
| pjTaskHideBar | 188743789 | |
| pjTaskConfirmed | 188743790 | |
| pjTaskUpdateNeeded | 188743791 | |
| pjTaskContact | 188743792 | |
| pjTaskResourceGroup | 188743793 | |
| pjTaskACWP | 188743800 | |
| pjTaskType | 188743808 | |
| pjTaskRecurring | 188743809 | |
| pjTaskEffortDriven | 188743812 | |
| pjTaskParentTask | 188743815 | |
| pjTaskOvertimeWork | 188743843 | |
| pjTaskActualOvertimeWork | 188743844 | |
| pjTaskRemainingOvertimeWork | 188743845 | |
| pjTaskRegularWork | 188743846 | |
| pjTaskOvertimeCost | 188743848 | |
| pjTaskActualOvertimeCost | 188743849 | |
| pjTaskRemainingOvertimeCost | 188743850 | |
| pjTaskFixedCostAccrual | 188743880 | |
| pjTaskIndicators | 188743885 | |
| pjTaskHyperlink | 188743897 | |
| pjTaskHyperlinkAddress | 188743898 | |
| pjTaskHyperlinkSubAddress | 188743899 | |
| pjTaskHyperlinkHref | 188743900 | |
| pjTaskIsAssignment | 188743904 | |
| pjTaskOverallocated | 188743905 | |
| pjTaskExternalTask | 188743912 | |
| pjTaskSubprojectReadOnly | 188743926 | |
| pjTaskResponsePending | 188743930 | |
| pjTaskTeamStatusPending | 188743931 | |
| pjTaskLevelCanSplit | 188743932 | |
| pjTaskLevelAssignments | 188743933 | |
| pjTaskWorkContour | 188743936 | |
| pjTaskCost4 | 188743938 | |
| pjTaskCost5 | 188743939 | |
| pjTaskCost6 | 188743940 | |
| pjTaskCost7 | 188743941 | |
| pjTaskCost8 | 188743942 | |
| pjTaskCost9 | 188743943 | |
| pjTaskCost10 | 188743944 | |
| pjTaskDate1 | 188743945 | |
| pjTaskDate2 | 188743946 | |
| pjTaskDate3 | 188743947 | |
| pjTaskDate4 | 188743948 | |
| pjTaskDate5 | 188743949 | |
| pjTaskDate6 | 188743950 | |
| pjTaskDate7 | 188743951 | |
| pjTaskDate8 | 188743952 | |
| pjTaskDate9 | 188743953 | |
| pjTaskDate10 | 188743954 | |
| pjTaskDuration4 | 188743955 | |
| pjTaskDuration5 | 188743956 | |
| pjTaskDuration6 | 188743957 | |
| pjTaskDuration7 | 188743958 | |
| pjTaskDuration8 | 188743959 | |
| pjTaskDuration9 | 188743960 | |
| pjTaskDuration10 | 188743961 | |
| pjTaskStart6 | 188743962 | |
| pjTaskFinish6 | 188743963 | |
| pjTaskStart7 | 188743964 | |
| pjTaskFinish7 | 188743965 | |
| pjTaskStart8 | 188743966 | |
| pjTaskFinish8 | 188743967 | |
| pjTaskStart9 | 188743968 | |
| pjTaskFinish9 | 188743969 | |
| pjTaskStart10 | 188743970 | |
| pjTaskFinish10 | 188743971 | |
| pjTaskFlag11 | 188743972 | |
| pjTaskFlag12 | 188743973 | |
| pjTaskFlag13 | 188743974 | |
| pjTaskFlag14 | 188743975 | |
| pjTaskFlag15 | 188743976 | |
| pjTaskFlag16 | 188743977 | |
| pjTaskFlag17 | 188743978 | |
| pjTaskFlag18 | 188743979 | |
| pjTaskFlag19 | 188743980 | |
| pjTaskFlag20 | 188743981 | |
| pjTaskNumber6 | 188743982 | |
| pjTaskNumber7 | 188743983 | |
| pjTaskNumber8 | 188743984 | |
| pjTaskNumber9 | 188743985 | |
| pjTaskNumber10 | 188743986 | |
| pjTaskNumber11 | 188743987 | |
| pjTaskNumber12 | 188743988 | |
| pjTaskNumber13 | 188743989 | |
| pjTaskNumber14 | 188743990 | |
| pjTaskNumber15 | 188743991 | |
| pjTaskNumber16 | 188743992 | |
| pjTaskNumber17 | 188743993 | |
| pjTaskNumber18 | 188743994 | |
| pjTaskNumber19 | 188743995 | |
| pjTaskNumber20 | 188743996 | |
| pjTaskText11 | 188743997 | |
| pjTaskText12 | 188743998 | |
| pjTaskText13 | 188743999 | |
| pjTaskText14 | 188744000 | |
| pjTaskText15 | 188744001 | |
| pjTaskText16 | 188744002 | |
| pjTaskText17 | 188744003 | |
| pjTaskText18 | 188744004 | |
| pjTaskText19 | 188744005 | |
| pjTaskText20 | 188744006 | |
| pjTaskText21 | 188744007 | |
| pjTaskText22 | 188744008 | |
| pjTaskText23 | 188744009 | |
| pjTaskText24 | 188744010 | |
| pjTaskText25 | 188744011 | |
| pjTaskText26 | 188744012 | |
| pjTaskText27 | 188744013 | |
| pjTaskText28 | 188744014 | |
| pjTaskText29 | 188744015 | |
| pjTaskText30 | 188744016 | |
| pjTaskResourcePhonetics | 188744029 | |
| pjTaskIndex | 188744040 | |
| pjTaskAssignmentDelay | 188744046 | |
| pjTaskAssignmentUnits | 188744047 | |
| pjTaskCostRateTable | 188744048 | |
| pjTaskPreleveledStart | 188744049 | |
| pjTaskPreleveledFinish | 188744050 | |
| pjTaskEstimated | 188744076 | |
| pjTaskIgnoreResourceCalendar | 188744079 | |
| pjTaskCalendar | 188744082 | |
| pjTaskDuration1Estimated | 188744083 | |
| pjTaskDuration2Estimated | 188744084 | |
| pjTaskDuration3Estimated | 188744085 | |
| pjTaskDuration4Estimated | 188744086 | |
| pjTaskDuration5Estimated | 188744087 | |
| pjTaskDuration6Estimated | 188744088 | |
| pjTaskDuration7Estimated | 188744089 | |
| pjTaskDuration8Estimated | 188744090 | |
| pjTaskDuration9Estimated | 188744091 | |
| pjTaskDuration10Estimated | 188744092 | |
| pjTaskBaselineDurationEstimated | 188744093 | |
| pjTaskOutlineCode1 | 188744096 | |
| pjTaskOutlineCode2 | 188744098 | |
| pjTaskOutlineCode3 | 188744100 | |
| pjTaskOutlineCode4 | 188744102 | |
| pjTaskOutlineCode5 | 188744104 | |
| pjTaskOutlineCode6 | 188744106 | |
| pjTaskOutlineCode7 | 188744108 | |
| pjTaskOutlineCode8 | 188744110 | |
| pjTaskOutlineCode9 | 188744112 | |
| pjTaskOutlineCode10 | 188744114 | |
| pjTaskDeadline | 188744117 | |
| pjTaskStartSlack | 188744118 | |
| pjTaskFinishSlack | 188744119 | |
| pjTaskVAC | 188744121 | |
| pjTaskGroupBySummary | 188744126 | |
| pjTaskWBSPredecessors | 188744129 | |
| pjTaskWBSSuccessors | 188744130 | |
| pjTaskResourceType | 188744131 | |
| pjTaskHyperlinkScreenTip | 188744132 | |
| pjTaskBaseline1Start | 188744162 | |
| pjTaskBaseline1Finish | 188744163 | |
| pjTaskBaseline1Cost | 188744164 | |
| pjTaskBaseline1Work | 188744165 | |
| pjTaskBaseline1Duration | 188744167 | |
| pjTaskBaseline2Start | 188744173 | |
| pjTaskBaseline2Finish | 188744174 | |
| pjTaskBaseline2Cost | 188744175 | |
| pjTaskBaseline2Work | 188744176 | |
| pjTaskBaseline2Duration | 188744178 | |
| pjTaskBaseline3Start | 188744184 | |
| pjTaskBaseline3Finish | 188744185 | |
| pjTaskBaseline3Cost | 188744186 | |
| pjTaskBaseline3Work | 188744187 | |
| pjTaskBaseline3Duration | 188744189 | |
| pjTaskBaseline4Start | 188744195 | |
| pjTaskBaseline4Finish | 188744196 | |
| pjTaskBaseline4Cost | 188744197 | |
| pjTaskBaseline4Work | 188744198 | |
| pjTaskBaseline4Duration | 188744200 | |
| pjTaskBaseline5Start | 188744206 | |
| pjTaskBaseline5Finish | 188744207 | |
| pjTaskBaseline5Cost | 188744208 | |
| pjTaskBaseline5Work | 188744209 | |
| pjTaskBaseline5Duration | 188744211 | |
| pjTaskCPI | 188744217 | |
| pjTaskSPI | 188744218 | |
| pjTaskCVPercent | 188744219 | |
| pjTaskSVPercent | 188744220 | |
| pjTaskEAC | 188744221 | |
| pjTaskTCPI | 188744222 | |
| pjTaskStatus | 188744223 | |
| pjTaskBaseline6Start | 188744224 | |
| pjTaskBaseline6Finish | 188744225 | |
| pjTaskBaseline6Cost | 188744226 | |
| pjTaskBaseline6Work | 188744227 | |
| pjTaskBaseline6Duration | 188744229 | |
| pjTaskBaseline7Start | 188744235 | |
| pjTaskBaseline7Finish | 188744236 | |
| pjTaskBaseline7Cost | 188744237 | |
| pjTaskBaseline7Work | 188744238 | |
| pjTaskBaseline7Duration | 188744240 | |
| pjTaskBaseline8Start | 188744246 | |
| pjTaskBaseline8Finish | 188744247 | |
| pjTaskBaseline8Cost | 188744248 | |
| pjTaskBaseline8Work | 188744249 | |
| pjTaskBaseline8Duration | 188744251 | |
| pjTaskBaseline9Start | 188744257 | |
| pjTaskBaseline9Finish | 188744258 | |
| pjTaskBaseline9Cost | 188744259 | |
| pjTaskBaseline9Work | 188744260 | |
| pjTaskBaseline9Duration | 188744262 | |
| pjTaskBaseline10Start | 188744268 | |
| pjTaskBaseline10Finish | 188744269 | |
| pjTaskBaseline10Cost | 188744270 | |
| pjTaskBaseline10Work | 188744271 | |
| pjTaskBaseline10Duration | 188744273 | |
| pjTaskEnterpriseCost1 | 188744279 | |
| pjTaskEnterpriseCost2 | 188744280 | |
| pjTaskEnterpriseCost3 | 188744281 | |
| pjTaskEnterpriseCost4 | 188744282 | |
| pjTaskEnterpriseCost5 | 188744283 | |
| pjTaskEnterpriseCost6 | 188744284 | |
| pjTaskEnterpriseCost7 | 188744285 | |
| pjTaskEnterpriseCost8 | 188744286 | |
| pjTaskEnterpriseCost9 | 188744287 | |
| pjTaskEnterpriseCost10 | 188744288 | |
| pjTaskEnterpriseDate1 | 188744289 | |
| pjTaskEnterpriseDate2 | 188744290 | |
| pjTaskEnterpriseDate3 | 188744291 | |
| pjTaskEnterpriseDate4 | 188744292 | |
| pjTaskEnterpriseDate5 | 188744293 | |
| pjTaskEnterpriseDate6 | 188744294 | |
| pjTaskEnterpriseDate7 | 188744295 | |
| pjTaskEnterpriseDate8 | 188744296 | |
| pjTaskEnterpriseDate9 | 188744297 | |
| pjTaskEnterpriseDate10 | 188744298 | |
| pjTaskEnterpriseDate11 | 188744299 | |
| pjTaskEnterpriseDate12 | 188744300 | |
| pjTaskEnterpriseDate13 | 188744301 | |
| pjTaskEnterpriseDate14 | 188744302 | |
| pjTaskEnterpriseDate15 | 188744303 | |
| pjTaskEnterpriseDate16 | 188744304 | |
| pjTaskEnterpriseDate17 | 188744305 | |
| pjTaskEnterpriseDate18 | 188744306 | |
| pjTaskEnterpriseDate19 | 188744307 | |
| pjTaskEnterpriseDate20 | 188744308 | |
| pjTaskEnterpriseDate21 | 188744309 | |
| pjTaskEnterpriseDate22 | 188744310 | |
| pjTaskEnterpriseDate23 | 188744311 | |
| pjTaskEnterpriseDate24 | 188744312 | |
| pjTaskEnterpriseDate25 | 188744313 | |
| pjTaskEnterpriseDate26 | 188744314 | |
| pjTaskEnterpriseDate27 | 188744315 | |
| pjTaskEnterpriseDate28 | 188744316 | |
| pjTaskEnterpriseDate29 | 188744317 | |
| pjTaskEnterpriseDate30 | 188744318 | |
| pjTaskEnterpriseDuration1 | 188744319 | |
| pjTaskEnterpriseDuration2 | 188744320 | |
| pjTaskEnterpriseDuration3 | 188744321 | |
| pjTaskEnterpriseDuration4 | 188744322 | |
| pjTaskEnterpriseDuration5 | 188744323 | |
| pjTaskEnterpriseDuration6 | 188744324 | |
| pjTaskEnterpriseDuration7 | 188744325 | |
| pjTaskEnterpriseDuration8 | 188744326 | |
| pjTaskEnterpriseDuration9 | 188744327 | |
| pjTaskEnterpriseDuration10 | 188744328 | |
| pjTaskEnterpriseFlag1 | 188744339 | |
| pjTaskEnterpriseFlag2 | 188744340 | |
| pjTaskEnterpriseFlag3 | 188744341 | |
| pjTaskEnterpriseFlag4 | 188744342 | |
| pjTaskEnterpriseFlag5 | 188744343 | |
| pjTaskEnterpriseFlag6 | 188744344 | |
| pjTaskEnterpriseFlag7 | 188744345 | |
| pjTaskEnterpriseFlag8 | 188744346 | |
| pjTaskEnterpriseFlag9 | 188744347 | |
| pjTaskEnterpriseFlag10 | 188744348 | |
| pjTaskEnterpriseFlag11 | 188744349 | |
| pjTaskEnterpriseFlag12 | 188744350 | |
| pjTaskEnterpriseFlag13 | 188744351 | |
| pjTaskEnterpriseFlag14 | 188744352 | |
| pjTaskEnterpriseFlag15 | 188744353 | |
| pjTaskEnterpriseFlag16 | 188744354 | |
| pjTaskEnterpriseFlag17 | 188744355 | |
| pjTaskEnterpriseFlag18 | 188744356 | |
| pjTaskEnterpriseFlag19 | 188744357 | |
| pjTaskEnterpriseFlag20 | 188744358 | |
| pjTaskEnterpriseNumber1 | 188744379 | |
| pjTaskEnterpriseNumber2 | 188744380 | |
| pjTaskEnterpriseNumber3 | 188744381 | |
| pjTaskEnterpriseNumber4 | 188744382 | |
| pjTaskEnterpriseNumber5 | 188744383 | |
| pjTaskEnterpriseNumber6 | 188744384 | |
| pjTaskEnterpriseNumber7 | 188744385 | |
| pjTaskEnterpriseNumber8 | 188744386 | |
| pjTaskEnterpriseNumber9 | 188744387 | |
| pjTaskEnterpriseNumber10 | 188744388 | |
| pjTaskEnterpriseNumber11 | 188744389 | |
| pjTaskEnterpriseNumber12 | 188744390 | |
| pjTaskEnterpriseNumber13 | 188744391 | |
| pjTaskEnterpriseNumber14 | 188744392 | |
| pjTaskEnterpriseNumber15 | 188744393 | |
| pjTaskEnterpriseNumber16 | 188744394 | |
| pjTaskEnterpriseNumber17 | 188744395 | |
| pjTaskEnterpriseNumber18 | 188744396 | |
| pjTaskEnterpriseNumber19 | 188744397 | |
| pjTaskEnterpriseNumber20 | 188744398 | |
| pjTaskEnterpriseNumber21 | 188744399 | |
| pjTaskEnterpriseNumber22 | 188744400 | |
| pjTaskEnterpriseNumber23 | 188744401 | |
| pjTaskEnterpriseNumber24 | 188744402 | |
| pjTaskEnterpriseNumber25 | 188744403 | |
| pjTaskEnterpriseNumber26 | 188744404 | |
| pjTaskEnterpriseNumber27 | 188744405 | |
| pjTaskEnterpriseNumber28 | 188744406 | |
| pjTaskEnterpriseNumber29 | 188744407 | |
| pjTaskEnterpriseNumber30 | 188744408 | |
| pjTaskEnterpriseNumber31 | 188744409 | |
| pjTaskEnterpriseNumber32 | 188744410 | |
| pjTaskEnterpriseNumber33 | 188744411 | |
| pjTaskEnterpriseNumber34 | 188744412 | |
| pjTaskEnterpriseNumber35 | 188744413 | |
| pjTaskEnterpriseNumber36 | 188744414 | |
| pjTaskEnterpriseNumber37 | 188744415 | |
| pjTaskEnterpriseNumber38 | 188744416 | |
| pjTaskEnterpriseNumber39 | 188744417 | |
| pjTaskEnterpriseNumber40 | 188744418 | |
| pjTaskEnterpriseOutlineCode1 | 188744419 | |
| pjTaskEnterpriseOutlineCode2 | 188744421 | |
| pjTaskEnterpriseOutlineCode3 | 188744423 | |
| pjTaskEnterpriseOutlineCode4 | 188744425 | |
| pjTaskEnterpriseOutlineCode5 | 188744427 | |
| pjTaskEnterpriseOutlineCode6 | 188744429 | |
| pjTaskEnterpriseOutlineCode7 | 188744431 | |
| pjTaskEnterpriseOutlineCode8 | 188744433 | |
| pjTaskEnterpriseOutlineCode9 | 188744435 | |
| pjTaskEnterpriseOutlineCode10 | 188744437 | |
| pjTaskEnterpriseOutlineCode11 | 188744439 | |
| pjTaskEnterpriseOutlineCode12 | 188744441 | |
| pjTaskEnterpriseOutlineCode13 | 188744443 | |
| pjTaskEnterpriseOutlineCode14 | 188744445 | |
| pjTaskEnterpriseOutlineCode15 | 188744447 | |
| pjTaskEnterpriseOutlineCode16 | 188744449 | |
| pjTaskEnterpriseOutlineCode17 | 188744451 | |
| pjTaskEnterpriseOutlineCode18 | 188744453 | |
| pjTaskEnterpriseOutlineCode19 | 188744455 | |
| pjTaskEnterpriseOutlineCode20 | 188744457 | |
| pjTaskEnterpriseOutlineCode21 | 188744459 | |
| pjTaskEnterpriseOutlineCode22 | 188744461 | |
| pjTaskEnterpriseOutlineCode23 | 188744463 | |
| pjTaskEnterpriseOutlineCode24 | 188744465 | |
| pjTaskEnterpriseOutlineCode25 | 188744467 | |
| pjTaskEnterpriseOutlineCode26 | 188744469 | |
| pjTaskEnterpriseOutlineCode27 | 188744471 | |
| pjTaskEnterpriseOutlineCode28 | 188744473 | |
| pjTaskEnterpriseOutlineCode29 | 188744475 | |
| pjTaskEnterpriseOutlineCode30 | 188744477 | |
| pjTaskEnterpriseText1 | 188744479 | |
| pjTaskEnterpriseText2 | 188744480 | |
| pjTaskEnterpriseText3 | 188744481 | |
| pjTaskEnterpriseText4 | 188744482 | |
| pjTaskEnterpriseText5 | 188744483 | |
| pjTaskEnterpriseText6 | 188744484 | |
| pjTaskEnterpriseText7 | 188744485 | |
| pjTaskEnterpriseText8 | 188744486 | |
| pjTaskEnterpriseText9 | 188744487 | |
| pjTaskEnterpriseText10 | 188744488 | |
| pjTaskEnterpriseText11 | 188744489 | |
| pjTaskEnterpriseText12 | 188744490 | |
| pjTaskEnterpriseText13 | 188744491 | |
| pjTaskEnterpriseText14 | 188744492 | |
| pjTaskEnterpriseText15 | 188744493 | |
| pjTaskEnterpriseText16 | 188744494 | |
| pjTaskEnterpriseText17 | 188744495 | |
| pjTaskEnterpriseText18 | 188744496 | |
| pjTaskEnterpriseText19 | 188744497 | |
| pjTaskEnterpriseText20 | 188744498 | |
| pjTaskEnterpriseText21 | 188744499 | |
| pjTaskEnterpriseText22 | 188744500 | |
| pjTaskEnterpriseText23 | 188744501 | |
| pjTaskEnterpriseText24 | 188744502 | |
| pjTaskEnterpriseText25 | 188744503 | |
| pjTaskEnterpriseText26 | 188744504 | |
| pjTaskEnterpriseText27 | 188744505 | |
| pjTaskEnterpriseText28 | 188744506 | |
| pjTaskEnterpriseText29 | 188744507 | |
| pjTaskEnterpriseText30 | 188744508 | |
| pjTaskEnterpriseText31 | 188744509 | |
| pjTaskEnterpriseText32 | 188744510 | |
| pjTaskEnterpriseText33 | 188744511 | |
| pjTaskEnterpriseText34 | 188744512 | |
| pjTaskEnterpriseText35 | 188744513 | |
| pjTaskEnterpriseText36 | 188744514 | |
| pjTaskEnterpriseText37 | 188744515 | |
| pjTaskEnterpriseText38 | 188744516 | |
| pjTaskEnterpriseText39 | 188744517 | |
| pjTaskEnterpriseText40 | 188744518 | |
| pjTaskBaseline1DurationEstimated | 188744519 | |
| pjTaskBaseline2DurationEstimated | 188744520 | |
| pjTaskBaseline3DurationEstimated | 188744521 | |
| pjTaskBaseline4DurationEstimated | 188744522 | |
| pjTaskBaseline5DurationEstimated | 188744523 | |
| pjTaskBaseline6DurationEstimated | 188744524 | |
| pjTaskBaseline7DurationEstimated | 188744525 | |
| pjTaskBaseline8DurationEstimated | 188744526 | |
| pjTaskBaseline9DurationEstimated | 188744527 | |
| pjTaskBaseline10DurationEstimated | 188744528 | |
| pjTaskEnterpriseProjectCost1 | 188744529 | |
| pjTaskEnterpriseProjectCost2 | 188744530 | |
| pjTaskEnterpriseProjectCost3 | 188744531 | |
| pjTaskEnterpriseProjectCost4 | 188744532 | |
| pjTaskEnterpriseProjectCost5 | 188744533 | |
| pjTaskEnterpriseProjectCost6 | 188744534 | |
| pjTaskEnterpriseProjectCost7 | 188744535 | |
| pjTaskEnterpriseProjectCost8 | 188744536 | |
| pjTaskEnterpriseProjectCost9 | 188744537 | |
| pjTaskEnterpriseProjectCost10 | 188744538 | |
| pjTaskEnterpriseProjectDate1 | 188744539 | |
| pjTaskEnterpriseProjectDate2 | 188744540 | |
| pjTaskEnterpriseProjectDate3 | 188744541 | |
| pjTaskEnterpriseProjectDate4 | 188744542 | |
| pjTaskEnterpriseProjectDate5 | 188744543 | |
| pjTaskEnterpriseProjectDate6 | 188744544 | |
| pjTaskEnterpriseProjectDate7 | 188744545 | |
| pjTaskEnterpriseProjectDate8 | 188744546 | |
| pjTaskEnterpriseProjectDate9 | 188744547 | |
| pjTaskEnterpriseProjectDate10 | 188744548 | |
| pjTaskEnterpriseProjectDate11 | 188744549 | |
| pjTaskEnterpriseProjectDate12 | 188744550 | |
| pjTaskEnterpriseProjectDate13 | 188744551 | |
| pjTaskEnterpriseProjectDate14 | 188744552 | |
| pjTaskEnterpriseProjectDate15 | 188744553 | |
| pjTaskEnterpriseProjectDate16 | 188744554 | |
| pjTaskEnterpriseProjectDate17 | 188744555 | |
| pjTaskEnterpriseProjectDate18 | 188744556 | |
| pjTaskEnterpriseProjectDate19 | 188744557 | |
| pjTaskEnterpriseProjectDate20 | 188744558 | |
| pjTaskEnterpriseProjectDate21 | 188744559 | |
| pjTaskEnterpriseProjectDate22 | 188744560 | |
| pjTaskEnterpriseProjectDate23 | 188744561 | |
| pjTaskEnterpriseProjectDate24 | 188744562 | |
| pjTaskEnterpriseProjectDate25 | 188744563 | |
| pjTaskEnterpriseProjectDate26 | 188744564 | |
| pjTaskEnterpriseProjectDate27 | 188744565 | |
| pjTaskEnterpriseProjectDate28 | 188744566 | |
| pjTaskEnterpriseProjectDate29 | 188744567 | |
| pjTaskEnterpriseProjectDate30 | 188744568 | |
| pjTaskEnterpriseProjectDuration1 | 188744569 | |
| pjTaskEnterpriseProjectDuration2 | 188744570 | |
| pjTaskEnterpriseProjectDuration3 | 188744571 | |
| pjTaskEnterpriseProjectDuration4 | 188744572 | |
| pjTaskEnterpriseProjectDuration5 | 188744573 | |
| pjTaskEnterpriseProjectDuration6 | 188744574 | |
| pjTaskEnterpriseProjectDuration7 | 188744575 | |
| pjTaskEnterpriseProjectDuration8 | 188744576 | |
| pjTaskEnterpriseProjectDuration9 | 188744577 | |
| pjTaskEnterpriseProjectDuration10 | 188744578 | |
| pjTaskEnterpriseProjectOutlineCode1 | 188744589 | |
| pjTaskEnterpriseProjectOutlineCode2 | 188744590 | |
| pjTaskEnterpriseProjectOutlineCode3 | 188744591 | |
| pjTaskEnterpriseProjectOutlineCode4 | 188744592 | |
| pjTaskEnterpriseProjectOutlineCode5 | 188744593 | |
| pjTaskEnterpriseProjectOutlineCode6 | 188744594 | |
| pjTaskEnterpriseProjectOutlineCode7 | 188744595 | |
| pjTaskEnterpriseProjectOutlineCode8 | 188744596 | |
| pjTaskEnterpriseProjectOutlineCode9 | 188744597 | |
| pjTaskEnterpriseProjectOutlineCode10 | 188744598 | |
| pjTaskEnterpriseProjectOutlineCode11 | 188744599 | |
| pjTaskEnterpriseProjectOutlineCode12 | 188744600 | |
| pjTaskEnterpriseProjectOutlineCode13 | 188744601 | |
| pjTaskEnterpriseProjectOutlineCode14 | 188744602 | |
| pjTaskEnterpriseProjectOutlineCode15 | 188744603 | |
| pjTaskEnterpriseProjectOutlineCode16 | 188744604 | |
| pjTaskEnterpriseProjectOutlineCode17 | 188744605 | |
| pjTaskEnterpriseProjectOutlineCode18 | 188744606 | |
| pjTaskEnterpriseProjectOutlineCode19 | 188744607 | |
| pjTaskEnterpriseProjectOutlineCode20 | 188744608 | |
| pjTaskEnterpriseProjectOutlineCode21 | 188744609 | |
| pjTaskEnterpriseProjectOutlineCode22 | 188744610 | |
| pjTaskEnterpriseProjectOutlineCode23 | 188744611 | |
| pjTaskEnterpriseProjectOutlineCode24 | 188744612 | |
| pjTaskEnterpriseProjectOutlineCode25 | 188744613 | |
| pjTaskEnterpriseProjectOutlineCode26 | 188744614 | |
| pjTaskEnterpriseProjectOutlineCode27 | 188744615 | |
| pjTaskEnterpriseProjectOutlineCode28 | 188744616 | |
| pjTaskEnterpriseProjectOutlineCode29 | 188744617 | |
| pjTaskEnterpriseProjectOutlineCode30 | 188744618 | |
| pjTaskEnterpriseProjectFlag1 | 188744649 | |
| pjTaskEnterpriseProjectFlag2 | 188744650 | |
| pjTaskEnterpriseProjectFlag3 | 188744651 | |
| pjTaskEnterpriseProjectFlag4 | 188744652 | |
| pjTaskEnterpriseProjectFlag5 | 188744653 | |
| pjTaskEnterpriseProjectFlag6 | 188744654 | |
| pjTaskEnterpriseProjectFlag7 | 188744655 | |
| pjTaskEnterpriseProjectFlag8 | 188744656 | |
| pjTaskEnterpriseProjectFlag9 | 188744657 | |
| pjTaskEnterpriseProjectFlag10 | 188744658 | |
| pjTaskEnterpriseProjectFlag11 | 188744659 | |
| pjTaskEnterpriseProjectFlag12 | 188744660 | |
| pjTaskEnterpriseProjectFlag13 | 188744661 | |
| pjTaskEnterpriseProjectFlag14 | 188744662 | |
| pjTaskEnterpriseProjectFlag15 | 188744663 | |
| pjTaskEnterpriseProjectFlag16 | 188744664 | |
| pjTaskEnterpriseProjectFlag17 | 188744665 | |
| pjTaskEnterpriseProjectFlag18 | 188744666 | |
| pjTaskEnterpriseProjectFlag19 | 188744667 | |
| pjTaskEnterpriseProjectFlag20 | 188744668 | |
| pjTaskEnterpriseProjectNumber1 | 188744689 | |
| pjTaskEnterpriseProjectNumber2 | 188744690 | |
| pjTaskEnterpriseProjectNumber3 | 188744691 | |
| pjTaskEnterpriseProjectNumber4 | 188744692 | |
| pjTaskEnterpriseProjectNumber5 | 188744693 | |
| pjTaskEnterpriseProjectNumber6 | 188744694 | |
| pjTaskEnterpriseProjectNumber7 | 188744695 | |
| pjTaskEnterpriseProjectNumber8 | 188744696 | |
| pjTaskEnterpriseProjectNumber9 | 188744697 | |
| pjTaskEnterpriseProjectNumber10 | 188744698 | |
| pjTaskEnterpriseProjectNumber11 | 188744699 | |
| pjTaskEnterpriseProjectNumber12 | 188744700 | |
| pjTaskEnterpriseProjectNumber13 | 188744701 | |
| pjTaskEnterpriseProjectNumber14 | 188744702 | |
| pjTaskEnterpriseProjectNumber15 | 188744703 | |
| pjTaskEnterpriseProjectNumber16 | 188744704 | |
| pjTaskEnterpriseProjectNumber17 | 188744705 | |
| pjTaskEnterpriseProjectNumber18 | 188744706 | |
| pjTaskEnterpriseProjectNumber19 | 188744707 | |
| pjTaskEnterpriseProjectNumber20 | 188744708 | |
| pjTaskEnterpriseProjectNumber21 | 188744709 | |
| pjTaskEnterpriseProjectNumber22 | 188744710 | |
| pjTaskEnterpriseProjectNumber23 | 188744711 | |
| pjTaskEnterpriseProjectNumber24 | 188744712 | |
| pjTaskEnterpriseProjectNumber25 | 188744713 | |
| pjTaskEnterpriseProjectNumber26 | 188744714 | |
| pjTaskEnterpriseProjectNumber27 | 188744715 | |
| pjTaskEnterpriseProjectNumber28 | 188744716 | |
| pjTaskEnterpriseProjectNumber29 | 188744717 | |
| pjTaskEnterpriseProjectNumber30 | 188744718 | |
| pjTaskEnterpriseProjectNumber31 | 188744719 | |
| pjTaskEnterpriseProjectNumber32 | 188744720 | |
| pjTaskEnterpriseProjectNumber33 | 188744721 | |
| pjTaskEnterpriseProjectNumber34 | 188744722 | |
| pjTaskEnterpriseProjectNumber35 | 188744723 | |
| pjTaskEnterpriseProjectNumber36 | 188744724 | |
| pjTaskEnterpriseProjectNumber37 | 188744725 | |
| pjTaskEnterpriseProjectNumber38 | 188744726 | |
| pjTaskEnterpriseProjectNumber39 | 188744727 | |
| pjTaskEnterpriseProjectNumber40 | 188744728 | |
| pjTaskEnterpriseProjectText1 | 188744729 | |
| pjTaskEnterpriseProjectText2 | 188744730 | |
| pjTaskEnterpriseProjectText3 | 188744731 | |
| pjTaskEnterpriseProjectText4 | 188744732 | |
| pjTaskEnterpriseProjectText5 | 188744733 | |
| pjTaskEnterpriseProjectText6 | 188744734 | |
| pjTaskEnterpriseProjectText7 | 188744735 | |
| pjTaskEnterpriseProjectText8 | 188744736 | |
| pjTaskEnterpriseProjectText9 | 188744737 | |
| pjTaskEnterpriseProjectText10 | 188744738 | |
| pjTaskEnterpriseProjectText11 | 188744739 | |
| pjTaskEnterpriseProjectText12 | 188744740 | |
| pjTaskEnterpriseProjectText13 | 188744741 | |
| pjTaskEnterpriseProjectText14 | 188744742 | |
| pjTaskEnterpriseProjectText15 | 188744743 | |
| pjTaskEnterpriseProjectText16 | 188744744 | |
| pjTaskEnterpriseProjectText17 | 188744745 | |
| pjTaskEnterpriseProjectText18 | 188744746 | |
| pjTaskEnterpriseProjectText19 | 188744747 | |
| pjTaskEnterpriseProjectText20 | 188744748 | |
| pjTaskEnterpriseProjectText21 | 188744749 | |
| pjTaskEnterpriseProjectText22 | 188744750 | |
| pjTaskEnterpriseProjectText23 | 188744751 | |
| pjTaskEnterpriseProjectText24 | 188744752 | |
| pjTaskEnterpriseProjectText25 | 188744753 | |
| pjTaskEnterpriseProjectText26 | 188744754 | |
| pjTaskEnterpriseProjectText27 | 188744755 | |
| pjTaskEnterpriseProjectText28 | 188744756 | |
| pjTaskEnterpriseProjectText29 | 188744757 | |
| pjTaskEnterpriseProjectText30 | 188744758 | |
| pjTaskEnterpriseProjectText31 | 188744759 | |
| pjTaskEnterpriseProjectText32 | 188744760 | |
| pjTaskEnterpriseProjectText33 | 188744761 | |
| pjTaskEnterpriseProjectText34 | 188744762 | |
| pjTaskEnterpriseProjectText35 | 188744763 | |
| pjTaskEnterpriseProjectText36 | 188744764 | |
| pjTaskEnterpriseProjectText37 | 188744765 | |
| pjTaskEnterpriseProjectText38 | 188744766 | |
| pjTaskEnterpriseProjectText39 | 188744767 | |
| pjTaskEnterpriseProjectText40 | 188744768 | |
| pjTaskResourceEnterpriseOutlineCode1 | 188744769 | |
| pjTaskResourceEnterpriseOutlineCode2 | 188744770 | |
| pjTaskResourceEnterpriseOutlineCode3 | 188744771 | |
| pjTaskResourceEnterpriseOutlineCode4 | 188744772 | |
| pjTaskResourceEnterpriseOutlineCode5 | 188744773 | |
| pjTaskResourceEnterpriseOutlineCode6 | 188744774 | |
| pjTaskResourceEnterpriseOutlineCode7 | 188744775 | |
| pjTaskResourceEnterpriseOutlineCode8 | 188744776 | |
| pjTaskResourceEnterpriseOutlineCode9 | 188744777 | |
| pjTaskResourceEnterpriseOutlineCode10 | 188744778 | |
| pjTaskResourceEnterpriseOutlineCode11 | 188744779 | |
| pjTaskResourceEnterpriseOutlineCode12 | 188744780 | |
| pjTaskResourceEnterpriseOutlineCode13 | 188744781 | |
| pjTaskResourceEnterpriseOutlineCode14 | 188744782 | |
| pjTaskResourceEnterpriseOutlineCode15 | 188744783 | |
| pjTaskResourceEnterpriseOutlineCode16 | 188744784 | |
| pjTaskResourceEnterpriseOutlineCode17 | 188744785 | |
| pjTaskResourceEnterpriseOutlineCode18 | 188744786 | |
| pjTaskResourceEnterpriseOutlineCode19 | 188744787 | |
| pjTaskResourceEnterpriseOutlineCode20 | 188744788 | |
| pjTaskResourceEnterpriseOutlineCode21 | 188744789 | |
| pjTaskResourceEnterpriseOutlineCode22 | 188744790 | |
| pjTaskResourceEnterpriseOutlineCode23 | 188744791 | |
| pjTaskResourceEnterpriseOutlineCode24 | 188744792 | |
| pjTaskResourceEnterpriseOutlineCode25 | 188744793 | |
| pjTaskResourceEnterpriseOutlineCode26 | 188744794 | |
| pjTaskResourceEnterpriseOutlineCode27 | 188744795 | |
| pjTaskResourceEnterpriseOutlineCode28 | 188744796 | |
| pjTaskResourceEnterpriseOutlineCode29 | 188744797 | |
| pjTaskResourceEnterpriseRBS | 188744798 | |
| pjTaskPhysicalPercentComplete | 188744799 | |
| pjTaskDemandedRequested | 188744800 | |
| pjTaskStatusIndicator | 188744801 | |
| pjTaskEarnedValueMethod | 188744802 | |
| pjTaskResourceEnterpriseMultiValueCode20 | 188744809 | |
| pjTaskResourceEnterpriseMultiValueCode21 | 188744810 | |
| pjTaskResourceEnterpriseMultiValueCode22 | 188744811 | |
| pjTaskResourceEnterpriseMultiValueCode23 | 188744812 | |
| pjTaskResourceEnterpriseMultiValueCode24 | 188744813 | |
| pjTaskResourceEnterpriseMultiValueCode25 | 188744814 | |
| pjTaskResourceEnterpriseMultiValueCode26 | 188744815 | |
| pjTaskResourceEnterpriseMultiValueCode27 | 188744816 | |
| pjTaskResourceEnterpriseMultiValueCode28 | 188744817 | |
| pjTaskResourceEnterpriseMultiValueCode29 | 188744818 | |
| pjTaskActualWorkProtected | 188744819 | |
| pjTaskActualOvertimeWorkProtected | 188744820 | |
| pjTaskGuid | 188744823 | |
| pjTaskCalendarGuid | 188744824 | |
| pjTaskDeliverableGuid | 188744826 | |
| pjTaskDeliverableType | 188744827 | |
| pjTaskDeliverableStart | 188744832 | |
| pjTaskDeliverableFinish | 188744833 | |
| pjTaskIsPublished | 188744845 | |
| pjTaskStatusManagerName | 188744846 | |
| pjTaskErrorMessage | 188744847 | |
| pjTaskBudgetWork | 188744851 | |
| pjTaskBudgetCost | 188744852 | |
| pjTaskBaselineFixedCostAccrual | 188744853 | |
| pjTaskBaselineDeliverableStart | 188744854 | |
| pjTaskBaselineDeliverableFinish | 188744855 | |
| pjTaskBaselineBudgetWork | 188744856 | |
| pjTaskBaselineBudgetCost | 188744857 | |
| pjTaskBaseline1FixedCostAccrual | 188744860 | |
| pjTaskBaseline1DeliverableStart | 188744861 | |
| pjTaskBaseline1DeliverableFinish | 188744862 | |
| pjTaskBaseline1BudgetWork | 188744863 | |
| pjTaskBaseline1BudgetCost | 188744864 | |
| pjTaskBaseline2FixedCostAccrual | 188744867 | |
| pjTaskBaseline2DeliverableStart | 188744868 | |
| pjTaskBaseline2DeliverableFinish | 188744869 | |
| pjTaskBaseline2BudgetWork | 188744870 | |
| pjTaskBaseline2BudgetCost | 188744871 | |
| pjTaskBaseline3FixedCostAccrual | 188744874 | |
| pjTaskBaseline3DeliverableStart | 188744875 | |
| pjTaskBaseline3DeliverableFinish | 188744876 | |
| pjTaskBaseline3BudgetWork | 188744877 | |
| pjTaskBaseline3BudgetCost | 188744878 | |
| pjTaskBaseline4FixedCostAccrual | 188744881 | |
| pjTaskBaseline4DeliverableStart | 188744882 | |
| pjTaskBaseline4DeliverableFinish | 188744883 | |
| pjTaskBaseline4BudgetWork | 188744884 | |
| pjTaskBaseline4BudgetCost | 188744885 | |
| pjTaskBaseline5FixedCostAccrual | 188744888 | |
| pjTaskBaseline5DeliverableStart | 188744889 | |
| pjTaskBaseline5DeliverableFinish | 188744890 | |
| pjTaskBaseline5BudgetWork | 188744891 | |
| pjTaskBaseline5BudgetCost | 188744892 | |
| pjTaskBaseline6FixedCostAccrual | 188744895 | |
| pjTaskBaseline6DeliverableStart | 188744896 | |
| pjTaskBaseline6DeliverableFinish | 188744897 | |
| pjTaskBaseline6BudgetWork | 188744898 | |
| pjTaskBaseline6BudgetCost | 188744899 | |
| pjTaskBaseline7FixedCostAccrual | 188744902 | |
| pjTaskBaseline7DeliverableStart | 188744903 | |
| pjTaskBaseline7DeliverableFinish | 188744904 | |
| pjTaskBaseline7BudgetWork | 188744905 | |
| pjTaskBaseline7BudgetCost | 188744906 | |
| pjTaskBaseline8FixedCostAccrual | 188744909 | |
| pjTaskBaseline8DeliverableStart | 188744910 | |
| pjTaskBaseline8DeliverableFinish | 188744911 | |
| pjTaskBaseline8BudgetWork | 188744912 | |
| pjTaskBaseline8BudgetCost | 188744913 | |
| pjTaskBaseline9FixedCostAccrual | 188744916 | |
| pjTaskBaseline9DeliverableStart | 188744917 | |
| pjTaskBaseline9DeliverableFinish | 188744918 | |
| pjTaskBaseline9BudgetWork | 188744919 | |
| pjTaskBaseline9BudgetCost | 188744920 | |
| pjTaskBaseline10FixedCostAccrual | 188744923 | |
| pjTaskBaseline10DeliverableStart | 188744924 | |
| pjTaskBaseline10DeliverableFinish | 188744925 | |
| pjTaskBaseline10BudgetWork | 188744926 | |
| pjTaskBaseline10BudgetCost | 188744927 | |
| pjTaskRecalcFlags | 188744930 | |
| pjTaskDeliverableName | 188744956 | |
| pjTaskActive | 188744959 | |
| pjTaskManual | 188744960 | |
| pjTaskPlaceholder | 188744961 | |
| pjTaskWarning | 188744962 | |
| pjTaskStartText | 188744965 | |
| pjTaskFinishText | 188744966 | |
| pjTaskDurationText | 188744967 | |
| pjTaskIsStartValid | 188744975 | |
| pjTaskIsFinishValid | 188744976 | |
| pjTaskIsDurationValid | 188744977 | |
| pjTaskBaselineStartText | 188744979 | |
| pjTaskBaselineFinishText | 188744980 | |
| pjTaskBaselineDurationText | 188744981 | |
| pjTaskBaseline1StartText | 188744982 | |
| pjTaskBaseline1FinishText | 188744983 | |
| pjTaskBaseline1DurationText | 188744984 | |
| pjTaskBaseline2StartText | 188744985 | |
| pjTaskBaseline2FinishText | 188744986 | |
| pjTaskBaseline2DurationText | 188744987 | |
| pjTaskBaseline3StartText | 188744988 | |
| pjTaskBaseline3FinishText | 188744989 | |
| pjTaskBaseline3DurationText | 188744990 | |
| pjTaskBaseline4StartText | 188744991 | |
| pjTaskBaseline4FinishText | 188744992 | |
| pjTaskBaseline4DurationText | 188744993 | |
| pjTaskBaseline5StartText | 188744994 | |
| pjTaskBaseline5FinishText | 188744995 | |
| pjTaskBaseline5DurationText | 188744996 | |
| pjTaskBaseline6StartText | 188744997 | |
| pjTaskBaseline6FinishText | 188744998 | |
| pjTaskBaseline6DurationText | 188744999 | |
| pjTaskBaseline7StartText | 188745000 | |
| pjTaskBaseline7FinishText | 188745001 | |
| pjTaskBaseline7DurationText | 188745002 | |
| pjTaskBaseline8StartText | 188745003 | |
| pjTaskBaseline8FinishText | 188745004 | |
| pjTaskBaseline8DurationText | 188745005 | |
| pjTaskBaseline9StartText | 188745006 | |
| pjTaskBaseline9FinishText | 188745007 | |
| pjTaskBaseline9DurationText | 188745008 | |
| pjTaskBaseline10StartText | 188745009 | |
| pjTaskBaseline10FinishText | 188745010 | |
| pjTaskBaseline10DurationText | 188745011 | |
| pjTaskIgnoreWarnings | 188745012 | |
| pjTaskAssignmentPeakUnits | 188745015 | |
| pjTaskScheduledStart | 188745018 | |
| pjTaskScheduledFinish | 188745019 | |
| pjTaskScheduledDuration | 188745020 | |
| pjTaskPathDrivingPredecessor | 188745061 | |
| pjTaskPathPredecessor | 188745062 | |
| pjTaskPathDrivenSuccessor | 188745063 | |
| pjTaskPathSuccessor | 188745064 | |
| pjResourceID | 205520896 | |
| pjResourceName | 205520897 | |
| pjResourceInitials | 205520898 | |
| pjResourceGroup | 205520899 | |
| pjResourceMaxUnits | 205520900 | |
| pjResourceBaseCalendar | 205520901 | |
| pjResourceStandardRate | 205520902 | |
| pjResourceOvertimeRate | 205520903 | |
| pjResourceText1 | 205520904 | |
| pjResourceText2 | 205520905 | |
| pjResourceCode | 205520906 | |
| pjResourceActualCost | 205520907 | |
| pjResourceCost | 205520908 | |
| pjResourceWork | 205520909 | |
| pjResourceActualWork | 205520910 | |
| pjResourceBaselineWork | 205520911 | |
| pjResourceOvertimeWork | 205520912 | |
| pjResourceBaselineCost | 205520913 | |
| pjResourceCostPerUse | 205520914 | |
| pjResourceAccrueAt | 205520915 | |
| pjResourceNotes | 205520916 | |
| pjResourceRemainingCost | 205520917 | |
| pjResourceRemainingWork | 205520918 | |
| pjResourceWorkVariance | 205520919 | |
| pjResourceCostVariance | 205520920 | |
| pjResourceOverallocated | 205520921 | |
| pjResourcePeakUnits | 205520922 | |
| pjResourceUniqueID | 205520923 | |
| pjResourceSheetNotes | 205520924 | |
| pjResourcePercentWorkComplete | 205520925 | |
| pjResourceText3 | 205520926 | |
| pjResourceText4 | 205520927 | |
| pjResourceText5 | 205520928 | |
| pjResourceObjects | 205520929 | |
| pjResourceLinkedFields | 205520930 | |
| pjResourceEMailAddress | 205520931 | |
| pjResourceRegularWork | 205520934 | |
| pjResourceActualOvertimeWork | 205520935 | |
| pjResourceRemainingOvertimeWork | 205520936 | |
| pjResourceOvertimeCost | 205520943 | |
| pjResourceActualOvertimeCost | 205520944 | |
| pjResourceRemainingOvertimeCost | 205520945 | |
| pjResourceBCWS | 205520947 | |
| pjResourceBCWP | 205520948 | |
| pjResourceACWP | 205520949 | |
| pjResourceSV | 205520950 | |
| pjResourceAvailableFrom | 205520953 | |
| pjResourceAvailableTo | 205520954 | |
| pjResourceIndicators | 205520982 | |
| pjResourceText6 | 205520993 | |
| pjResourceText7 | 205520994 | |
| pjResourceText8 | 205520995 | |
| pjResourceText9 | 205520996 | |
| pjResourceText10 | 205520997 | |
| pjResourceStart1 | 205520998 | |
| pjResourceStart2 | 205520999 | |
| pjResourceStart3 | 205521000 | |
| pjResourceStart4 | 205521001 | |
| pjResourceStart5 | 205521002 | |
| pjResourceFinish1 | 205521003 | |
| pjResourceFinish2 | 205521004 | |
| pjResourceFinish3 | 205521005 | |
| pjResourceFinish4 | 205521006 | |
| pjResourceFinish5 | 205521007 | |
| pjResourceNumber1 | 205521008 | |
| pjResourceNumber2 | 205521009 | |
| pjResourceNumber3 | 205521010 | |
| pjResourceNumber4 | 205521011 | |
| pjResourceNumber5 | 205521012 | |
| pjResourceDuration1 | 205521013 | |
| pjResourceDuration2 | 205521014 | |
| pjResourceDuration3 | 205521015 | |
| pjResourceCost1 | 205521019 | |
| pjResourceCost2 | 205521020 | |
| pjResourceCost3 | 205521021 | |
| pjResourceFlag10 | 205521022 | |
| pjResourceFlag1 | 205521023 | |
| pjResourceFlag2 | 205521024 | |
| pjResourceFlag3 | 205521025 | |
| pjResourceFlag4 | 205521026 | |
| pjResourceFlag5 | 205521027 | |
| pjResourceFlag6 | 205521028 | |
| pjResourceFlag7 | 205521029 | |
| pjResourceFlag8 | 205521030 | |
| pjResourceFlag9 | 205521031 | |
| pjResourceHyperlink | 205521034 | |
| pjResourceHyperlinkAddress | 205521035 | |
| pjResourceHyperlinkSubAddress | 205521036 | |
| pjResourceHyperlinkHref | 205521037 | |
| pjResourceIsAssignment | 205521040 | |
| pjResourceTaskSummaryName | 205521055 | |
| pjResourceCanLevel | 205521059 | |
| pjResourceWorkContour | 205521060 | |
| pjResourceCost4 | 205521062 | |
| pjResourceCost5 | 205521063 | |
| pjResourceCost6 | 205521064 | |
| pjResourceCost7 | 205521065 | |
| pjResourceCost8 | 205521066 | |
| pjResourceCost9 | 205521067 | |
| pjResourceCost10 | 205521068 | |
| pjResourceDate1 | 205521069 | |
| pjResourceDate2 | 205521070 | |
| pjResourceDate3 | 205521071 | |
| pjResourceDate4 | 205521072 | |
| pjResourceDate5 | 205521073 | |
| pjResourceDate6 | 205521074 | |
| pjResourceDate7 | 205521075 | |
| pjResourceDate8 | 205521076 | |
| pjResourceDate9 | 205521077 | |
| pjResourceDate10 | 205521078 | |
| pjResourceDuration4 | 205521079 | |
| pjResourceDuration5 | 205521080 | |
| pjResourceDuration6 | 205521081 | |
| pjResourceDuration7 | 205521082 | |
| pjResourceDuration8 | 205521083 | |
| pjResourceDuration9 | 205521084 | |
| pjResourceDuration10 | 205521085 | |
| pjResourceFinish6 | 205521086 | |
| pjResourceFinish7 | 205521087 | |
| pjResourceFinish8 | 205521088 | |
| pjResourceFinish9 | 205521089 | |
| pjResourceFinish10 | 205521090 | |
| pjResourceFlag11 | 205521091 | |
| pjResourceFlag12 | 205521092 | |
| pjResourceFlag13 | 205521093 | |
| pjResourceFlag14 | 205521094 | |
| pjResourceFlag15 | 205521095 | |
| pjResourceFlag16 | 205521096 | |
| pjResourceFlag17 | 205521097 | |
| pjResourceFlag18 | 205521098 | |
| pjResourceFlag19 | 205521099 | |
| pjResourceFlag20 | 205521100 | |
| pjResourceNumber6 | 205521101 | |
| pjResourceNumber7 | 205521102 | |
| pjResourceNumber8 | 205521103 | |
| pjResourceNumber9 | 205521104 | |
| pjResourceNumber10 | 205521105 | |
| pjResourceNumber11 | 205521106 | |
| pjResourceNumber12 | 205521107 | |
| pjResourceNumber13 | 205521108 | |
| pjResourceNumber14 | 205521109 | |
| pjResourceNumber15 | 205521110 | |
| pjResourceNumber16 | 205521111 | |
| pjResourceNumber17 | 205521112 | |
| pjResourceNumber18 | 205521113 | |
| pjResourceNumber19 | 205521114 | |
| pjResourceNumber20 | 205521115 | |
| pjResourceStart6 | 205521116 | |
| pjResourceStart7 | 205521117 | |
| pjResourceStart8 | 205521118 | |
| pjResourceStart9 | 205521119 | |
| pjResourceStart10 | 205521120 | |
| pjResourceText11 | 205521121 | |
| pjResourceText12 | 205521122 | |
| pjResourceText13 | 205521123 | |
| pjResourceText14 | 205521124 | |
| pjResourceText15 | 205521125 | |
| pjResourceText16 | 205521126 | |
| pjResourceText17 | 205521127 | |
| pjResourceText18 | 205521128 | |
| pjResourceText19 | 205521129 | |
| pjResourceText20 | 205521130 | |
| pjResourceText21 | 205521131 | |
| pjResourceText22 | 205521132 | |
| pjResourceText23 | 205521133 | |
| pjResourceText24 | 205521134 | |
| pjResourceText25 | 205521135 | |
| pjResourceText26 | 205521136 | |
| pjResourceText27 | 205521137 | |
| pjResourceText28 | 205521138 | |
| pjResourceText29 | 205521139 | |
| pjResourceText30 | 205521140 | |
| pjResourcePhonetics | 205521148 | |
| pjResourceIndex | 205521149 | |
| pjResourceAssignmentDelay | 205521153 | |
| pjResourceAssignmentUnits | 205521154 | |
| pjResourceBaselineStart | 205521155 | |
| pjResourceBaselineFinish | 205521156 | |
| pjResourceConfirmed | 205521157 | |
| pjResourceFinish | 205521158 | |
| pjResourceLevelingDelay | 205521159 | |
| pjResourceResponsePending | 205521160 | |
| pjResourceStart | 205521161 | |
| pjResourceTeamStatusPending | 205521162 | |
| pjResourceUpdateNeeded | 205521163 | |
| pjResourceCV | 205521164 | |
| pjResourceCostRateTable | 205521165 | |
| pjResourceWorkgroup | 205521168 | |
| pjResourceProject | 205521169 | |
| pjResourceOutlineCode1 | 205521174 | |
| pjResourceOutlineCode2 | 205521176 | |
| pjResourceOutlineCode3 | 205521178 | |
| pjResourceOutlineCode4 | 205521180 | |
| pjResourceOutlineCode5 | 205521182 | |
| pjResourceOutlineCode6 | 205521184 | |
| pjResourceOutlineCode7 | 205521186 | |
| pjResourceOutlineCode8 | 205521188 | |
| pjResourceOutlineCode9 | 205521190 | |
| pjResourceOutlineCode10 | 205521192 | |
| pjResourceMaterialLabel | 205521195 | |
| pjResourceType | 205521196 | |
| pjResourceVAC | 205521197 | |
| pjResourceGroupbySummary | 205521202 | |
| pjResourceWindowsUserAccount | 205521207 | |
| pjResourceHyperlinkScreenTip | 205521208 | |
| pjResourceWBS | 205521236 | |
| pjResourceBaseline1Work | 205521238 | |
| pjResourceBaseline1Cost | 205521239 | |
| pjResourceBaseline1Start | 205521244 | |
| pjResourceBaseline1Finish | 205521245 | |
| pjResourceBaseline2Work | 205521248 | |
| pjResourceBaseline2Cost | 205521249 | |
| pjResourceBaseline2Start | 205521254 | |
| pjResourceBaseline2Finish | 205521255 | |
| pjResourceBaseline3Work | 205521258 | |
| pjResourceBaseline3Cost | 205521259 | |
| pjResourceBaseline3Start | 205521264 | |
| pjResourceBaseline3Finish | 205521265 | |
| pjResourceBaseline4Work | 205521268 | |
| pjResourceBaseline4Cost | 205521269 | |
| pjResourceBaseline4Start | 205521274 | |
| pjResourceBaseline4Finish | 205521275 | |
| pjResourceBaseline5Work | 205521278 | |
| pjResourceBaseline5Cost | 205521279 | |
| pjResourceBaseline5Start | 205521284 | |
| pjResourceBaseline5Finish | 205521285 | |
| pjResourceBaseline6Work | 205521288 | |
| pjResourceBaseline6Cost | 205521289 | |
| pjResourceBaseline6Start | 205521294 | |
| pjResourceBaseline6Finish | 205521295 | |
| pjResourceBaseline7Work | 205521298 | |
| pjResourceBaseline7Cost | 205521299 | |
| pjResourceBaseline7Start | 205521304 | |
| pjResourceBaseline7Finish | 205521305 | |
| pjResourceBaseline8Work | 205521308 | |
| pjResourceBaseline8Cost | 205521309 | |
| pjResourceBaseline8Start | 205521314 | |
| pjResourceBaseline8Finish | 205521315 | |
| pjResourceBaseline9Work | 205521318 | |
| pjResourceBaseline9Cost | 205521319 | |
| pjResourceBaseline9Start | 205521324 | |
| pjResourceBaseline9Finish | 205521325 | |
| pjResourceBaseline10Work | 205521328 | |
| pjResourceBaseline10Cost | 205521329 | |
| pjResourceBaseline10Start | 205521334 | |
| pjResourceBaseline10Finish | 205521335 | |
| pjResourceEnterpriseUniqueID | 205521339 | |
| pjResourceEnterpriseCost1 | 205521342 | |
| pjResourceEnterpriseCost2 | 205521343 | |
| pjResourceEnterpriseCost3 | 205521344 | |
| pjResourceEnterpriseCost4 | 205521345 | |
| pjResourceEnterpriseCost5 | 205521346 | |
| pjResourceEnterpriseCost6 | 205521347 | |
| pjResourceEnterpriseCost7 | 205521348 | |
| pjResourceEnterpriseCost8 | 205521349 | |
| pjResourceEnterpriseCost9 | 205521350 | |
| pjResourceEnterpriseCost10 | 205521351 | |
| pjResourceEnterpriseDate1 | 205521352 | |
| pjResourceEnterpriseDate2 | 205521353 | |
| pjResourceEnterpriseDate3 | 205521354 | |
| pjResourceEnterpriseDate4 | 205521355 | |
| pjResourceEnterpriseDate5 | 205521356 | |
| pjResourceEnterpriseDate6 | 205521357 | |
| pjResourceEnterpriseDate7 | 205521358 | |
| pjResourceEnterpriseDate8 | 205521359 | |
| pjResourceEnterpriseDate9 | 205521360 | |
| pjResourceEnterpriseDate10 | 205521361 | |
| pjResourceEnterpriseDate11 | 205521362 | |
| pjResourceEnterpriseDate12 | 205521363 | |
| pjResourceEnterpriseDate13 | 205521364 | |
| pjResourceEnterpriseDate14 | 205521365 | |
| pjResourceEnterpriseDate15 | 205521366 | |
| pjResourceEnterpriseDate16 | 205521367 | |
| pjResourceEnterpriseDate17 | 205521368 | |
| pjResourceEnterpriseDate18 | 205521369 | |
| pjResourceEnterpriseDate19 | 205521370 | |
| pjResourceEnterpriseDate20 | 205521371 | |
| pjResourceEnterpriseDate21 | 205521372 | |
| pjResourceEnterpriseDate22 | 205521373 | |
| pjResourceEnterpriseDate23 | 205521374 | |
| pjResourceEnterpriseDate24 | 205521375 | |
| pjResourceEnterpriseDate25 | 205521376 | |
| pjResourceEnterpriseDate26 | 205521377 | |
| pjResourceEnterpriseDate27 | 205521378 | |
| pjResourceEnterpriseDate28 | 205521379 | |
| pjResourceEnterpriseDate29 | 205521380 | |
| pjResourceEnterpriseDate30 | 205521381 | |
| pjResourceEnterpriseDuration1 | 205521382 | |
| pjResourceEnterpriseDuration2 | 205521383 | |
| pjResourceEnterpriseDuration3 | 205521384 | |
| pjResourceEnterpriseDuration4 | 205521385 | |
| pjResourceEnterpriseDuration5 | 205521386 | |
| pjResourceEnterpriseDuration6 | 205521387 | |
| pjResourceEnterpriseDuration7 | 205521388 | |
| pjResourceEnterpriseDuration8 | 205521389 | |
| pjResourceEnterpriseDuration9 | 205521390 | |
| pjResourceEnterpriseDuration10 | 205521391 | |
| pjResourceEnterpriseFlag1 | 205521402 | |
| pjResourceEnterpriseFlag2 | 205521403 | |
| pjResourceEnterpriseFlag3 | 205521404 | |
| pjResourceEnterpriseFlag4 | 205521405 | |
| pjResourceEnterpriseFlag5 | 205521406 | |
| pjResourceEnterpriseFlag6 | 205521407 | |
| pjResourceEnterpriseFlag7 | 205521408 | |
| pjResourceEnterpriseFlag8 | 205521409 | |
| pjResourceEnterpriseFlag9 | 205521410 | |
| pjResourceEnterpriseFlag10 | 205521411 | |
| pjResourceEnterpriseFlag11 | 205521412 | |
| pjResourceEnterpriseFlag12 | 205521413 | |
| pjResourceEnterpriseFlag13 | 205521414 | |
| pjResourceEnterpriseFlag14 | 205521415 | |
| pjResourceEnterpriseFlag15 | 205521416 | |
| pjResourceEnterpriseFlag16 | 205521417 | |
| pjResourceEnterpriseFlag17 | 205521418 | |
| pjResourceEnterpriseFlag18 | 205521419 | |
| pjResourceEnterpriseFlag19 | 205521420 | |
| pjResourceEnterpriseFlag20 | 205521421 | |
| pjResourceEnterpriseNumber1 | 205521442 | |
| pjResourceEnterpriseNumber2 | 205521443 | |
| pjResourceEnterpriseNumber3 | 205521444 | |
| pjResourceEnterpriseNumber4 | 205521445 | |
| pjResourceEnterpriseNumber5 | 205521446 | |
| pjResourceEnterpriseNumber6 | 205521447 | |
| pjResourceEnterpriseNumber7 | 205521448 | |
| pjResourceEnterpriseNumber8 | 205521449 | |
| pjResourceEnterpriseNumber9 | 205521450 | |
| pjResourceEnterpriseNumber10 | 205521451 | |
| pjResourceEnterpriseNumber11 | 205521452 | |
| pjResourceEnterpriseNumber12 | 205521453 | |
| pjResourceEnterpriseNumber13 | 205521454 | |
| pjResourceEnterpriseNumber14 | 205521455 | |
| pjResourceEnterpriseNumber15 | 205521456 | |
| pjResourceEnterpriseNumber16 | 205521457 | |
| pjResourceEnterpriseNumber17 | 205521458 | |
| pjResourceEnterpriseNumber18 | 205521459 | |
| pjResourceEnterpriseNumber19 | 205521460 | |
| pjResourceEnterpriseNumber20 | 205521461 | |
| pjResourceEnterpriseNumber21 | 205521462 | |
| pjResourceEnterpriseNumber22 | 205521463 | |
| pjResourceEnterpriseNumber23 | 205521464 | |
| pjResourceEnterpriseNumber24 | 205521465 | |
| pjResourceEnterpriseNumber25 | 205521466 | |
| pjResourceEnterpriseNumber26 | 205521467 | |
| pjResourceEnterpriseNumber27 | 205521468 | |
| pjResourceEnterpriseNumber28 | 205521469 | |
| pjResourceEnterpriseNumber29 | 205521470 | |
| pjResourceEnterpriseNumber30 | 205521471 | |
| pjResourceEnterpriseNumber31 | 205521472 | |
| pjResourceEnterpriseNumber32 | 205521473 | |
| pjResourceEnterpriseNumber33 | 205521474 | |
| pjResourceEnterpriseNumber34 | 205521475 | |
| pjResourceEnterpriseNumber35 | 205521476 | |
| pjResourceEnterpriseNumber36 | 205521477 | |
| pjResourceEnterpriseNumber37 | 205521478 | |
| pjResourceEnterpriseNumber38 | 205521479 | |
| pjResourceEnterpriseNumber39 | 205521480 | |
| pjResourceEnterpriseNumber40 | 205521481 | |
| pjResourceEnterpriseOutlineCode1 | 205521482 | |
| pjResourceEnterpriseOutlineCode2 | 205521484 | |
| pjResourceEnterpriseOutlineCode3 | 205521486 | |
| pjResourceEnterpriseOutlineCode4 | 205521488 | |
| pjResourceEnterpriseOutlineCode5 | 205521490 | |
| pjResourceEnterpriseOutlineCode6 | 205521492 | |
| pjResourceEnterpriseOutlineCode7 | 205521494 | |
| pjResourceEnterpriseOutlineCode8 | 205521496 | |
| pjResourceEnterpriseOutlineCode9 | 205521498 | |
| pjResourceEnterpriseOutlineCode10 | 205521500 | |
| pjResourceEnterpriseOutlineCode11 | 205521502 | |
| pjResourceEnterpriseOutlineCode12 | 205521504 | |
| pjResourceEnterpriseOutlineCode13 | 205521506 | |
| pjResourceEnterpriseOutlineCode14 | 205521508 | |
| pjResourceEnterpriseOutlineCode15 | 205521510 | |
| pjResourceEnterpriseOutlineCode16 | 205521512 | |
| pjResourceEnterpriseOutlineCode17 | 205521514 | |
| pjResourceEnterpriseOutlineCode18 | 205521516 | |
| pjResourceEnterpriseOutlineCode19 | 205521518 | |
| pjResourceEnterpriseOutlineCode20 | 205521520 | |
| pjResourceEnterpriseOutlineCode21 | 205521522 | |
| pjResourceEnterpriseOutlineCode22 | 205521524 | |
| pjResourceEnterpriseOutlineCode23 | 205521526 | |
| pjResourceEnterpriseOutlineCode24 | 205521528 | |
| pjResourceEnterpriseOutlineCode25 | 205521530 | |
| pjResourceEnterpriseOutlineCode26 | 205521532 | |
| pjResourceEnterpriseOutlineCode27 | 205521534 | |
| pjResourceEnterpriseOutlineCode28 | 205521536 | |
| pjResourceEnterpriseOutlineCode29 | 205521538 | |
| pjResourceEnterpriseRBS | 205521540 | |
| pjResourceEnterpriseText1 | 205521542 | |
| pjResourceEnterpriseText2 | 205521543 | |
| pjResourceEnterpriseText3 | 205521544 | |
| pjResourceEnterpriseText4 | 205521545 | |
| pjResourceEnterpriseText5 | 205521546 | |
| pjResourceEnterpriseText6 | 205521547 | |
| pjResourceEnterpriseText7 | 205521548 | |
| pjResourceEnterpriseText8 | 205521549 | |
| pjResourceEnterpriseText9 | 205521550 | |
| pjResourceEnterpriseText10 | 205521551 | |
| pjResourceEnterpriseText11 | 205521552 | |
| pjResourceEnterpriseText12 | 205521553 | |
| pjResourceEnterpriseText13 | 205521554 | |
| pjResourceEnterpriseText14 | 205521555 | |
| pjResourceEnterpriseText15 | 205521556 | |
| pjResourceEnterpriseText16 | 205521557 | |
| pjResourceEnterpriseText17 | 205521558 | |
| pjResourceEnterpriseText18 | 205521559 | |
| pjResourceEnterpriseText19 | 205521560 | |
| pjResourceEnterpriseText20 | 205521561 | |
| pjResourceEnterpriseText21 | 205521562 | |
| pjResourceEnterpriseText22 | 205521563 | |
| pjResourceEnterpriseText23 | 205521564 | |
| pjResourceEnterpriseText24 | 205521565 | |
| pjResourceEnterpriseText25 | 205521566 | |
| pjResourceEnterpriseText26 | 205521567 | |
| pjResourceEnterpriseText27 | 205521568 | |
| pjResourceEnterpriseText28 | 205521569 | |
| pjResourceEnterpriseText29 | 205521570 | |
| pjResourceEnterpriseText30 | 205521571 | |
| pjResourceEnterpriseText31 | 205521572 | |
| pjResourceEnterpriseText32 | 205521573 | |
| pjResourceEnterpriseText33 | 205521574 | |
| pjResourceEnterpriseText34 | 205521575 | |
| pjResourceEnterpriseText35 | 205521576 | |
| pjResourceEnterpriseText36 | 205521577 | |
| pjResourceEnterpriseText37 | 205521578 | |
| pjResourceEnterpriseText38 | 205521579 | |
| pjResourceEnterpriseText39 | 205521580 | |
| pjResourceEnterpriseText40 | 205521581 | |
| pjResourceEnterpriseGeneric | 205521582 | |
| pjResourceEnterpriseBaseCalendar | 205521583 | |
| pjResourceEnterpriseRequiredValues | 205521584 | |
| pjResourceEnterpriseNameUsed | 205521585 | |
| pjResourceDemandedRequested | 205521586 | |
| pjResourceEnterprise | 205521587 | |
| pjResourceEnterpriseIsCheckedOut | 205521588 | |
| pjResourceEnterpriseCheckedOutBy | 205521589 | |
| pjResourceEnterpriseLastModifiedDate | 205521590 | |
| pjResourceEnterpriseTeamMember | 205521591 | |
| pjResourceEnterpriseInactive | 205521592 | |
| pjResourceBookingType | 205521595 | |
| pjResourceEnterpriseMultiValue20 | 205521596 | |
| pjResourceEnterpriseMultiValue21 | 205521598 | |
| pjResourceEnterpriseMultiValue22 | 205521600 | |
| pjResourceEnterpriseMultiValue23 | 205521602 | |
| pjResourceEnterpriseMultiValue24 | 205521604 | |
| pjResourceEnterpriseMultiValue25 | 205521606 | |
| pjResourceEnterpriseMultiValue26 | 205521608 | |
| pjResourceEnterpriseMultiValue27 | 205521610 | |
| pjResourceEnterpriseMultiValue28 | 205521612 | |
| pjResourceEnterpriseMultiValue29 | 205521614 | |
| pjResourceActualWorkProtected | 205521616 | |
| pjResourceActualOvertimeWorkProtected | 205521617 | |
| pjResourceCreated | 205521622 | |
| pjResourceGuid | 205521624 | |
| pjResourceCalendarGuid | 205521625 | |
| pjResourceErrorMessage | 205521634 | |
| pjResourceDefaultAssignmentOwner | 205521636 | |
| pjResourceBudget | 205521648 | |
| pjResourceBudgetWork | 205521649 | |
| pjResourceBudgetCost | 205521650 | |
| pjImportResource | 205521651 | |
| pjResourceBaselineBudgetWork | 205521652 | |
| pjResourceBaselineBudgetCost | 205521653 | |
| pjResourceBaseline1BudgetWork | 205521656 | |
| pjResourceBaseline1BudgetCost | 205521657 | |
| pjResourceBaseline2BudgetWork | 205521660 | |
| pjResourceBaseline2BudgetCost | 205521661 | |
| pjResourceBaseline3BudgetWork | 205521664 | |
| pjResourceBaseline3BudgetCost | 205521665 | |
| pjResourceBaseline4BudgetWork | 205521668 | |
| pjResourceBaseline4BudgetCost | 205521669 | |
| pjResourceBaseline5BudgetWork | 205521672 | |
| pjResourceBaseline5BudgetCost | 205521673 | |
| pjResourceBaseline6BudgetWork | 205521676 | |
| pjResourceBaseline6BudgetCost | 205521677 | |
| pjResourceBaseline7BudgetWork | 205521680 | |
| pjResourceBaseline7BudgetCost | 205521681 | |
| pjResourceBaseline8BudgetWork | 205521684 | |
| pjResourceBaseline8BudgetCost | 205521685 | |
| pjResourceBaseline9BudgetWork | 205521688 | |
| pjResourceBaseline9BudgetCost | 205521689 | |
| pjResourceBaseline10BudgetWork | 205521692 | |
| pjResourceBaseline10BudgetCost | 205521693 | |
| pjResourceIsTeam | 205521696 | |
| pjResourceCostCenter | 205521697 |