_CodeName
|
(Inherited from _IProjectDoc)
|
|
AcceptNewExternalData
|
(Inherited from _IProjectDoc)
|
|
ActualCost
|
(Inherited from _IProjectDoc)
|
|
ActualDuration
|
(Inherited from _IProjectDoc)
|
|
ActualFinish
|
(Inherited from _IProjectDoc)
|
|
ActualStart
|
(Inherited from _IProjectDoc)
|
|
ActualWork
|
(Inherited from _IProjectDoc)
|
|
AdministrativeProject
|
(Inherited from _IProjectDoc)
|
|
AllowTaskDelegation
|
(Inherited from _IProjectDoc)
|
|
AndMoveCompleted
|
(Inherited from _IProjectDoc)
|
|
AndMoveRemaining
|
(Inherited from _IProjectDoc)
|
|
Application
|
(Inherited from _IProjectDoc)
|
|
AskForCompletedWork
|
(Inherited from _IProjectDoc)
|
|
Author
|
(Inherited from _IProjectDoc)
|
|
AutoAddResources
|
(Inherited from _IProjectDoc)
|
|
AutoCalcCosts
|
(Inherited from _IProjectDoc)
|
|
AutoFilter
|
(Inherited from _IProjectDoc)
|
|
AutoLinkTasks
|
(Inherited from _IProjectDoc)
|
|
AutoSplitTasks
|
(Inherited from _IProjectDoc)
|
|
AutoTrack
|
(Inherited from _IProjectDoc)
|
|
BaseCalendars
|
(Inherited from _IProjectDoc)
|
|
BaselineCost
|
(Inherited from _IProjectDoc)
|
|
BaselineDuration
|
(Inherited from _IProjectDoc)
|
|
BaselineFinish
|
(Inherited from _IProjectDoc)
|
|
BaselineSavedDate[PjBaselines]
|
(Inherited from _IProjectDoc)
|
|
BaselineStart
|
(Inherited from _IProjectDoc)
|
|
BaselineWork
|
(Inherited from _IProjectDoc)
|
|
BCWP
|
(Inherited from _IProjectDoc)
|
|
BCWS
|
(Inherited from _IProjectDoc)
|
|
BuiltinDocumentProperties
|
(Inherited from _IProjectDoc)
|
|
Calendar
|
(Inherited from _IProjectDoc)
|
|
CanCheckIn
|
(Inherited from _IProjectDoc)
|
|
CodeName
|
(Inherited from _IProjectDoc)
|
|
CommandBars
|
(Inherited from _IProjectDoc)
|
|
Comments
|
(Inherited from _IProjectDoc)
|
|
Company
|
(Inherited from _IProjectDoc)
|
|
Confirmed
|
(Inherited from _IProjectDoc)
|
|
ConstraintDate
|
(Inherited from _IProjectDoc)
|
|
ConstraintType
|
(Inherited from _IProjectDoc)
|
|
Contact
|
(Inherited from _IProjectDoc)
|
|
Container
|
(Inherited from _IProjectDoc)
|
|
Cost
|
(Inherited from _IProjectDoc)
|
|
Cost1
|
(Inherited from _IProjectDoc)
|
|
Cost2
|
(Inherited from _IProjectDoc)
|
|
Cost3
|
(Inherited from _IProjectDoc)
|
|
CostVariance
|
(Inherited from _IProjectDoc)
|
|
Created
|
(Inherited from _IProjectDoc)
|
|
CreationDate
|
(Inherited from _IProjectDoc)
|
|
Critical
|
(Inherited from _IProjectDoc)
|
|
CurrencyCode
|
(Inherited from _IProjectDoc)
|
|
CurrencyDigits
|
(Inherited from _IProjectDoc)
|
|
CurrencySymbol
|
(Inherited from _IProjectDoc)
|
|
CurrencySymbolPosition
|
(Inherited from _IProjectDoc)
|
|
CurrentDate
|
(Inherited from _IProjectDoc)
|
|
CurrentFilter
|
(Inherited from _IProjectDoc)
|
|
CurrentGroup
|
(Inherited from _IProjectDoc)
|
|
CurrentTable
|
(Inherited from _IProjectDoc)
|
|
CurrentView
|
(Inherited from _IProjectDoc)
|
|
CustomDocumentProperties
|
(Inherited from _IProjectDoc)
|
|
CV
|
(Inherited from _IProjectDoc)
|
|
DatabaseProjectUniqueID
|
(Inherited from _IProjectDoc)
|
|
DayLabelDisplay
|
(Inherited from _IProjectDoc)
|
|
DaysPerMonth
|
(Inherited from _IProjectDoc)
|
|
DefaultDurationUnits
|
(Inherited from _IProjectDoc)
|
|
DefaultEarnedValueMethod
|
(Inherited from _IProjectDoc)
|
|
DefaultEffortDriven
|
(Inherited from _IProjectDoc)
|
|
DefaultFinishTime
|
(Inherited from _IProjectDoc)
|
|
DefaultFixedCostAccrual
|
(Inherited from _IProjectDoc)
|
|
DefaultResourceOvertimeRate
|
(Inherited from _IProjectDoc)
|
|
DefaultResourceStandardRate
|
(Inherited from _IProjectDoc)
|
|
DefaultStartTime
|
(Inherited from _IProjectDoc)
|
|
DefaultTaskType
|
(Inherited from _IProjectDoc)
|
|
DefaultWorkUnits
|
(Inherited from _IProjectDoc)
|
|
Delay
|
(Inherited from _IProjectDoc)
|
|
DetectCycle
|
(Inherited from _IProjectDoc)
|
|
DisplayProjectSummaryTask
|
(Inherited from _IProjectDoc)
|
|
DocumentLibraryVersions
|
(Inherited from _IProjectDoc)
|
|
Duration
|
(Inherited from _IProjectDoc)
|
|
Duration1
|
(Inherited from _IProjectDoc)
|
|
Duration2
|
(Inherited from _IProjectDoc)
|
|
Duration3
|
(Inherited from _IProjectDoc)
|
|
DurationVariance
|
(Inherited from _IProjectDoc)
|
|
EarlyFinish
|
(Inherited from _IProjectDoc)
|
|
EarlyStart
|
(Inherited from _IProjectDoc)
|
|
EarnedValueBaseline
|
(Inherited from _IProjectDoc)
|
|
EnterpriseActualsSynched
|
(Inherited from _IProjectDoc)
|
|
ExpandDatabaseTimephasedData
|
(Inherited from _IProjectDoc)
|
|
Finish
|
(Inherited from _IProjectDoc)
|
|
Finish1
|
(Inherited from _IProjectDoc)
|
|
Finish2
|
(Inherited from _IProjectDoc)
|
|
Finish3
|
(Inherited from _IProjectDoc)
|
|
Finish4
|
(Inherited from _IProjectDoc)
|
|
Finish5
|
(Inherited from _IProjectDoc)
|
|
FinishVariance
|
(Inherited from _IProjectDoc)
|
|
FixedCost
|
(Inherited from _IProjectDoc)
|
|
FixedDuration
|
(Inherited from _IProjectDoc)
|
|
Flag1
|
(Inherited from _IProjectDoc)
|
|
Flag10
|
(Inherited from _IProjectDoc)
|
|
Flag2
|
(Inherited from _IProjectDoc)
|
|
Flag3
|
(Inherited from _IProjectDoc)
|
|
Flag4
|
(Inherited from _IProjectDoc)
|
|
Flag5
|
(Inherited from _IProjectDoc)
|
|
Flag6
|
(Inherited from _IProjectDoc)
|
|
Flag7
|
(Inherited from _IProjectDoc)
|
|
Flag8
|
(Inherited from _IProjectDoc)
|
|
Flag9
|
(Inherited from _IProjectDoc)
|
|
FollowedHyperlinkColor
|
(Inherited from _IProjectDoc)
|
|
FollowedHyperlinkColorEx
|
(Inherited from _IProjectDoc)
|
|
FreeSlack
|
(Inherited from _IProjectDoc)
|
|
FullName
|
(Inherited from _IProjectDoc)
|
|
HasPassword
|
(Inherited from _IProjectDoc)
|
|
HideBar
|
(Inherited from _IProjectDoc)
|
|
HonorConstraints
|
(Inherited from _IProjectDoc)
|
|
HourLabelDisplay
|
(Inherited from _IProjectDoc)
|
|
HoursPerDay
|
(Inherited from _IProjectDoc)
|
|
HoursPerWeek
|
(Inherited from _IProjectDoc)
|
|
HyperlinkColor
|
(Inherited from _IProjectDoc)
|
|
HyperlinkColorEx
|
(Inherited from _IProjectDoc)
|
|
ID
|
(Inherited from _IProjectDoc)
|
|
Index
|
(Inherited from _IProjectDoc)
|
|
IsCheckoutMsgBarVisible
|
(Inherited from _IProjectDoc)
|
|
IsCheckoutOSVisible
|
(Inherited from _IProjectDoc)
|
|
IsTemplate
|
(Inherited from _IProjectDoc)
|
|
KeepTaskOnNearestWorkingTimeWhenMadeAutoScheduled
|
(Inherited from _IProjectDoc)
|
|
Keywords
|
(Inherited from _IProjectDoc)
|
|
LastPrintedDate
|
(Inherited from _IProjectDoc)
|
|
LastSaveDate
|
(Inherited from _IProjectDoc)
|
|
LastSavedBy
|
(Inherited from _IProjectDoc)
|
|
LateFinish
|
(Inherited from _IProjectDoc)
|
|
LateStart
|
(Inherited from _IProjectDoc)
|
|
LevelEntireProject
|
(Inherited from _IProjectDoc)
|
|
LevelFromDate
|
(Inherited from _IProjectDoc)
|
|
LevelToDate
|
(Inherited from _IProjectDoc)
|
|
LinkedFields
|
(Inherited from _IProjectDoc)
|
|
Manager
|
(Inherited from _IProjectDoc)
|
|
ManuallyScheduledTasksAutoRespectLinks
|
(Inherited from _IProjectDoc)
|
|
MapList
|
(Inherited from _IProjectDoc)
|
|
Marked
|
(Inherited from _IProjectDoc)
|
|
Milestone
|
(Inherited from _IProjectDoc)
|
|
MinuteLabelDisplay
|
(Inherited from _IProjectDoc)
|
|
MonthLabelDisplay
|
(Inherited from _IProjectDoc)
|
|
MoveCompleted
|
(Inherited from _IProjectDoc)
|
|
MoveRemaining
|
(Inherited from _IProjectDoc)
|
|
MultipleCriticalPaths
|
(Inherited from _IProjectDoc)
|
|
Name
|
(Inherited from _IProjectDoc)
|
|
NewTasksCreatedAsManual
|
(Inherited from _IProjectDoc)
|
|
NewTasksEstimated
|
(Inherited from _IProjectDoc)
|
|
Notes
|
(Inherited from _IProjectDoc)
|
|
Number1
|
(Inherited from _IProjectDoc)
|
|
Number2
|
(Inherited from _IProjectDoc)
|
|
Number3
|
(Inherited from _IProjectDoc)
|
|
Number4
|
(Inherited from _IProjectDoc)
|
|
Number5
|
(Inherited from _IProjectDoc)
|
|
NumberOfResources
|
(Inherited from _IProjectDoc)
|
|
NumberOfTasks
|
(Inherited from _IProjectDoc)
|
|
Objects
|
(Inherited from _IProjectDoc)
|
|
OutlineChildren
|
(Inherited from _IProjectDoc)
|
|
OutlineCodes
|
(Inherited from _IProjectDoc)
|
|
OutlineLevel
|
(Inherited from _IProjectDoc)
|
|
OutlineNumber
|
(Inherited from _IProjectDoc)
|
|
Parent
|
(Inherited from _IProjectDoc)
|
|
Path
|
(Inherited from _IProjectDoc)
|
|
PercentComplete
|
(Inherited from _IProjectDoc)
|
|
PercentWorkComplete
|
(Inherited from _IProjectDoc)
|
|
PhoneticType
|
(Inherited from _IProjectDoc)
|
|
Priority
|
(Inherited from _IProjectDoc)
|
|
Project
|
(Inherited from _IProjectDoc)
|
|
ProjectFinish
|
(Inherited from _IProjectDoc)
|
|
ProjectGuideContent
|
(Inherited from _IProjectDoc)
|
|
ProjectGuideFunctionalLayoutPage
|
(Inherited from _IProjectDoc)
|
|
ProjectGuideSaveBuffer
|
(Inherited from _IProjectDoc)
|
|
ProjectGuideUseDefaultContent
|
(Inherited from _IProjectDoc)
|
|
ProjectGuideUseDefaultFunctionalLayoutPage
|
(Inherited from _IProjectDoc)
|
|
ProjectNamePrefix
|
(Inherited from _IProjectDoc)
|
|
ProjectNotes
|
(Inherited from _IProjectDoc)
|
|
ProjectServerUsedForTracking
|
(Inherited from _IProjectDoc)
|
|
ProjectStart
|
(Inherited from _IProjectDoc)
|
|
ProjectSummaryTask
|
(Inherited from _IProjectDoc)
|
|
PublishInformationOnSave
|
(Inherited from _IProjectDoc)
|
|
ReadOnly
|
(Inherited from _IProjectDoc)
|
|
ReadOnlyRecommended
|
(Inherited from _IProjectDoc)
|
|
ReceiveNotifications
|
(Inherited from _IProjectDoc)
|
|
RemainingCost
|
(Inherited from _IProjectDoc)
|
|
RemainingDuration
|
(Inherited from _IProjectDoc)
|
|
RemainingWork
|
(Inherited from _IProjectDoc)
|
|
RemoveFileProperties
|
(Inherited from _IProjectDoc)
|
|
ReportList
|
(Inherited from _IProjectDoc)
|
|
Reports
|
(Inherited from _IProjectDoc)
|
|
ResourceFilterList
|
(Inherited from _IProjectDoc)
|
|
ResourceFilters
|
(Inherited from _IProjectDoc)
|
|
ResourceGroup
|
(Inherited from _IProjectDoc)
|
|
ResourceGroupList
|
(Inherited from _IProjectDoc)
|
|
ResourceGroups
|
(Inherited from _IProjectDoc)
|
|
ResourceGroups2
|
(Inherited from _IProjectDoc)
|
|
ResourceInitials
|
(Inherited from _IProjectDoc)
|
|
ResourceNames
|
(Inherited from _IProjectDoc)
|
|
ResourcePoolName
|
(Inherited from _IProjectDoc)
|
|
Resources
|
(Inherited from _IProjectDoc)
|
|
ResourceTableList
|
(Inherited from _IProjectDoc)
|
|
ResourceTables
|
(Inherited from _IProjectDoc)
|
|
ResourceViewList
|
(Inherited from _IProjectDoc)
|
|
Resume
|
(Inherited from _IProjectDoc)
|
|
ResumeNoEarlierThan
|
(Inherited from _IProjectDoc)
|
|
RevisionNumber
|
(Inherited from _IProjectDoc)
|
|
Rollup
|
(Inherited from _IProjectDoc)
|
|
Saved
|
(Inherited from _IProjectDoc)
|
|
ScheduleFromStart
|
(Inherited from _IProjectDoc)
|
|
SendHyperlinkNote
|
(Inherited from _IProjectDoc)
|
|
ServerIdentification
|
(Inherited from _IProjectDoc)
|
|
ServerPath
|
(Inherited from _IProjectDoc)
|
|
ServerURL
|
(Inherited from _IProjectDoc)
|
|
SharedWorkspace
|
(Inherited from _IProjectDoc)
|
|
ShowCriticalSlack
|
(Inherited from _IProjectDoc)
|
|
ShowCrossProjectLinksInfo
|
(Inherited from _IProjectDoc)
|
|
ShowEstimatedDuration
|
(Inherited from _IProjectDoc)
|
|
ShowExternalPredecessors
|
(Inherited from _IProjectDoc)
|
|
ShowExternalSuccessors
|
(Inherited from _IProjectDoc)
|
|
ShowTaskSuggestions
|
(Inherited from _IProjectDoc)
|
|
ShowTaskWarnings
|
(Inherited from _IProjectDoc)
|
|
SpaceBeforeTimeLabels
|
(Inherited from _IProjectDoc)
|
|
SpreadCostsToStatusDate
|
(Inherited from _IProjectDoc)
|
|
SpreadPercentCompleteToStatusDate
|
(Inherited from _IProjectDoc)
|
|
Start
|
(Inherited from _IProjectDoc)
|
|
Start1
|
(Inherited from _IProjectDoc)
|
|
Start2
|
(Inherited from _IProjectDoc)
|
|
Start3
|
(Inherited from _IProjectDoc)
|
|
Start4
|
(Inherited from _IProjectDoc)
|
|
Start5
|
(Inherited from _IProjectDoc)
|
|
StartOnCurrentDate
|
(Inherited from _IProjectDoc)
|
|
StartVariance
|
(Inherited from _IProjectDoc)
|
|
StartWeekOn
|
(Inherited from _IProjectDoc)
|
|
StartYearIn
|
(Inherited from _IProjectDoc)
|
|
StatusDate
|
(Inherited from _IProjectDoc)
|
|
Stop
|
(Inherited from _IProjectDoc)
|
|
Subject
|
(Inherited from _IProjectDoc)
|
|
Subprojects
|
(Inherited from _IProjectDoc)
|
|
Summary
|
(Inherited from _IProjectDoc)
|
|
SV
|
(Inherited from _IProjectDoc)
|
|
TaskErrorCount
|
(Inherited from _IProjectDoc)
|
|
TaskFilterList
|
(Inherited from _IProjectDoc)
|
|
TaskFilters
|
(Inherited from _IProjectDoc)
|
|
TaskGroupList
|
(Inherited from _IProjectDoc)
|
|
TaskGroups
|
(Inherited from _IProjectDoc)
|
|
TaskGroups2
|
(Inherited from _IProjectDoc)
|
|
Tasks
|
(Inherited from _IProjectDoc)
|
|
TaskTableList
|
(Inherited from _IProjectDoc)
|
|
TaskTables
|
(Inherited from _IProjectDoc)
|
|
TaskViewList
|
(Inherited from _IProjectDoc)
|
|
TeamMembersCanDeclineTasks
|
(Inherited from _IProjectDoc)
|
|
Template
|
(Inherited from _IProjectDoc)
|
|
TempToDoList
|
(Inherited from _IProjectDoc)
|
|
Text1
|
(Inherited from _IProjectDoc)
|
|
Text10
|
(Inherited from _IProjectDoc)
|
|
Text2
|
(Inherited from _IProjectDoc)
|
|
Text3
|
(Inherited from _IProjectDoc)
|
|
Text4
|
(Inherited from _IProjectDoc)
|
|
Text5
|
(Inherited from _IProjectDoc)
|
|
Text6
|
(Inherited from _IProjectDoc)
|
|
Text7
|
(Inherited from _IProjectDoc)
|
|
Text8
|
(Inherited from _IProjectDoc)
|
|
Text9
|
(Inherited from _IProjectDoc)
|
|
Title
|
(Inherited from _IProjectDoc)
|
|
TotalSlack
|
(Inherited from _IProjectDoc)
|
|
TrackingMethod
|
(Inherited from _IProjectDoc)
|
|
TrackOvertimeWork
|
(Inherited from _IProjectDoc)
|
|
Type
|
(Inherited from _IProjectDoc)
|
|
UnderlineHyperlinks
|
(Inherited from _IProjectDoc)
|
|
UniqueID
|
(Inherited from _IProjectDoc)
|
|
UpdateNeeded
|
(Inherited from _IProjectDoc)
|
|
UpdateProjOnSave
|
(Inherited from _IProjectDoc)
|
|
UseFYStartYear
|
(Inherited from _IProjectDoc)
|
|
UserControl
|
(Inherited from _IProjectDoc)
|
|
VBASigned
|
(Inherited from _IProjectDoc)
|
|
VBProject
|
(Inherited from _IProjectDoc)
|
|
VersionName
|
(Inherited from _IProjectDoc)
|
|
ViewList
|
(Inherited from _IProjectDoc)
|
|
Views
|
(Inherited from _IProjectDoc)
|
|
ViewsCombination
|
(Inherited from _IProjectDoc)
|
|
ViewsSingle
|
(Inherited from _IProjectDoc)
|
|
WBS
|
(Inherited from _IProjectDoc)
|
|
WBSCodeGenerate
|
(Inherited from _IProjectDoc)
|
|
WBSVerifyUniqueness
|
(Inherited from _IProjectDoc)
|
|
WeekLabelDisplay
|
(Inherited from _IProjectDoc)
|
|
Windows
|
(Inherited from _IProjectDoc)
|
|
Windows2
|
(Inherited from _IProjectDoc)
|
|
Work
|
(Inherited from _IProjectDoc)
|
|
WorkgroupMessages
|
(Inherited from _IProjectDoc)
|
|
WorkVariance
|
(Inherited from _IProjectDoc)
|
|
WriteReserved
|
(Inherited from _IProjectDoc)
|
|
YearLabelDisplay
|
(Inherited from _IProjectDoc)
|