Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Gets a Period object representing a period of time in a calendar. Read-only Period.
Syntax
expression. Period( _Start_, _Finish_ )
expression A variable that represents a Calendar object.
Parameters
| Name | Required/Optional | Data type | Description |
|---|---|---|---|
| Start | Required | Variant | The start date of the desired period. |
| Finish | Optional | Variant | The finish date of the desired period. The default value is the same date as Start. |
Return value
Period
Example
The following example sets a winter holiday for the active project.
Sub SetWinterHoliday()
ActiveProject.Calendar.Period("12/20/02", "12/31/02").Working = False
End Sub
Support and feedback
Have questions or feedback about Office VBA or this documentation? Please see Office VBA support and feedback for guidance about the ways you can receive support and provide feedback.