The following table describes each test case in the DVR Engine Scenario Tests.
| Test case | Result |
|---|---|
100 |
Tests conversion of a large temporary recording to a permanent recording. |
101 |
Verifies the pause buffer length is accurate. |
102 |
Verifies the end event is triggered. |
103 |
Verifies repeated building of the playback graph bound to live.. |
104 |
Verifies orphaning (dissociation of a portion of the pause buffer which the playback graph is accessing from the main buffer due to it falling out of the pause buffer) of a permanent recording. |
105 |
Verifies orphaning (dissociation of a portion of the pause buffer which the playback graph is accessing from the main buffer due to it falling out of the pause buffer) of a temporary recording |