Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
This optional test is provided to help troubleshoot certain test failures and is not required for certification.
This optional test can be used to stop a WWAN operating system trace collection. The test log file shows the location of the collected trace log file.
Test details
Associated requirements |
Device.DevFund.Reliability.Discretional System.Fundamentals.Reliability.Discretional |
Platforms |
Windows 7 (x64) Windows 7 (x86) Windows RT (ARM-based) Windows 8 (x64) Windows 8 (x86) Windows Server 2012 (x64) Windows Server 2008 R2 (x64) Windows RT 8.1 Windows 8.1 x64 Windows 8.1 x86 Windows Server 2012 R2 |
Expected run time |
~5 minutes |
Categories |
Optional |
Type |
Automated |
Running the test
You must run the Diagnosability - Tracing Jobs - WWAN - Start WWAN trace collection test before you run this test.
Related topics