Redagować

Udostępnij przez


Charts: Create and customize Excel charts with Office Scripts

This article demonstrates how to create every type of Excel chart that Office Scripts supports. Each sample includes data and showcases APIs specific to that chart type. Use these samples as starting points for your own charting solutions.

Note

Run these samples directly from the Office Scripts Code Editor. To open the Code Editor, go to Automate > New Script > Create in Code Editor. Replace the default code with the sample code you want to run, and then select Run.

Tip

For the best results, run each sample on an empty worksheet.

Column charts

Column charts display data as vertical bars, making them ideal for comparing values across categories.

Column clustered chart

This sample creates a clustered column chart that compares quarterly sales across different products.

A clustered column chart showing quarterly sales data for laptops, tablets, and phones across four quarters.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Product", "Q1", "Q2", "Q3", "Q4"],
    ["Laptops", 45000, 52000, 48000, 61000],
    ["Tablets", 32000, 35000, 38000, 42000],
    ["Phones", 28000, 31000, 29000, 35000]
  ];
  const dataRange = sheet.getRange("A1:E4");
  dataRange.setValues(data);
  
  // Create column clustered chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.columnClustered,
    dataRange
  );
  chart.setPosition("A6");
  chart.getTitle().setText("Quarterly Sales by Product");
  
  // Customize the chart.
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
  chart.getAxes().getValueAxis().setDisplayUnit(ExcelScript.ChartAxisDisplayUnit.thousands);
}

Column stacked chart

This sample creates a stacked column chart that shows the composition of sales by region.

A stacked column chart displaying regional sales contributions from North, South, East, and West regions across four months.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Month", "North", "South", "East", "West"],
    ["Jan", 15000, 18000, 22000, 19000],
    ["Feb", 17000, 19000, 21000, 20000],
    ["Mar", 19000, 21000, 23000, 22000],
    ["Apr", 21000, 22000, 25000, 24000]
  ];
  const dataRange = sheet.getRange("A1:E5");
  dataRange.setValues(data);
  
  // Create stacked column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.columnStacked,
    dataRange
  );
  chart.setPosition("A7");
  chart.getTitle().setText("Regional Sales Contribution");
  
  // Customize chart.
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
  chart.getAxes().getCategoryAxis().setReversePlotOrder(false);
}

Column stacked 100% chart

This sample creates a 100% stacked column chart that shows the percentage distribution.

A 100% stacked column chart showing the percentage distribution of desktop, mobile, and tablet usage across four quarters.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Category", "Desktop", "Mobile", "Tablet"],
    ["Q1", 5500, 3200, 1300],
    ["Q2", 4800, 3800, 1400],
    ["Q3", 4200, 4100, 1700],
    ["Q4", 3900, 4500, 1600]
  ];
  const dataRange = sheet.getRange("A1:D5");
  dataRange.setValues(data);
  
  // Create 100% stacked column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.columnStacked100,
    dataRange
  );
  chart.setPosition("A7");
  chart.getTitle().setText("Device Usage Distribution");
}

Bar charts

Bar charts display data as horizontal bars. They're useful when category names are long or you have many categories.

Bar clustered chart

This sample creates a clustered bar chart that compares employee performance ratings.

A clustered bar chart comparing technical, communication, and leadership ratings for five employees.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Employee", "Technical", "Communication", "Leadership"],
    ["Chantha Mean", 9.2, 8.8, 9.5],
    ["Marcio Alvez", 8.5, 9.1, 8.2],
    ["Sobia Khanam", 9.8, 9.3, 9.6],
    ["Altynbek Joldubai", 8.9, 8.5, 8.8],
    ["Adriana Mota", 9.5, 9.7, 9.2]
  ];
  const dataRange = sheet.getRange("A1:D6");
  dataRange.setValues(data);
  
  // Create bar clustered chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.barClustered,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Employee Performance Ratings");
  
  // Customize.
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
  chart.getAxes().getValueAxis().setMinimum(0);
  chart.getAxes().getValueAxis().setMaximum(10);
}

Bar stacked chart

A stacked bar chart showing project timelines with planning, development, testing, and deployment phases for three projects.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Project Phase", "Planning", "Development", "Testing", "Deployment"],
    ["Project A", 2, 6, 3, 1],
    ["Project B", 3, 8, 4, 2],
    ["Project C", 1, 5, 2, 1]
  ];
  const dataRange = sheet.getRange("A1:E4");
  dataRange.setValues(data);
  
  // Create bar stacked chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.barStacked,
    dataRange
  );
  chart.setPosition("A6");
  chart.getTitle().setText("Project Timeline (Weeks)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

100% stacked bar chart

This sample creates a 100% stacked bar chart that shows the percentage distribution across categories.

A 100% stacked bar chart showing quarterly sales mix by product as percentages.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Product A", "Product B", "Product C", "Product D"],
    ["Q1", 45000, 32000, 28000, 15000],
    ["Q2", 52000, 35000, 31000, 18000],
    ["Q3", 48000, 38000, 35000, 22000],
    ["Q4", 56000, 42000, 38000, 24000]
  ];
  const dataRange = sheet.getRange("A1:E5");
  dataRange.setValues(data);
  
  // Create 100% stacked bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.barStacked100,
    dataRange
  );
  chart.setPosition("A7");
  chart.getTitle().setText("Quarterly Sales Mix by Product (%)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Line charts

Line charts show trends over time. They're perfect for displaying continuous data.

Line chart

This sample creates a basic line chart that shows temperature trends.

A line chart displaying average monthly temperature trends throughout the year.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Month", "Avg Temp (°F)"],
    ["Jan", 42],
    ["Feb", 45],
    ["Mar", 52],
    ["Apr", 61],
    ["May", 70],
    ["Jun", 78],
    ["Jul", 84],
    ["Aug", 82],
    ["Sep", 75],
    ["Oct", 64],
    ["Nov", 53],
    ["Dec", 45]
  ];
  const dataRange = sheet.getRange("A1:B13");
  dataRange.setValues(data);
  
  // Create line chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.line,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Average Monthly Temperature");
  
  // Customize line chart.
  chart.getAxes().getCategoryAxis().setTickLabelPosition(
    ExcelScript.ChartAxisTickLabelPosition.low
  );
  chart.getAxes().getValueAxis().getMajorGridlines().getFormat().getLine().setColor("gray");
}

Line with markers chart

This sample creates a line chart with markers to emphasize individual data points.

A line chart with circular markers showing weekly visitor growth for three websites over six weeks.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Week", "Website A", "Website B", "Website C"],
    ["Week 1", 1250, 980, 1100],
    ["Week 2", 1380, 1050, 1150],
    ["Week 3", 1520, 1180, 1320],
    ["Week 4", 1690, 1280, 1450],
    ["Week 5", 1850, 1420, 1580],
    ["Week 6", 2020, 1590, 1720]
  ];
  const dataRange = sheet.getRange("A1:D7");
  dataRange.setValues(data);
  
  // Create line chart with markers.
  const chart = sheet.addChart(
    ExcelScript.ChartType.lineMarkers,
    dataRange
  );
  chart.setPosition("A9");
  chart.getTitle().setText("Weekly Visitor Growth");
  
  // Customize markers.
  const series = chart.getSeries();
  series.forEach((s) => {
    s.setMarkerSize(8);
    s.setMarkerStyle(ExcelScript.ChartMarkerStyle.circle);
  });
}

Line stacked chart

A stacked line chart showing cumulative product revenue for three products across four quarters.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Product A", "Product B", "Product C"],
    ["Q1 2024", 25000, 18000, 12000],
    ["Q2 2024", 28000, 20000, 14000],
    ["Q3 2024", 32000, 22000, 16000],
    ["Q4 2024", 35000, 25000, 18000]
  ];
  const dataRange = sheet.getRange("A1:D5");
  dataRange.setValues(data);
  
  // Create stacked line chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.lineStacked,
    dataRange
  );
  chart.setPosition("A7");
  chart.getTitle().setText("Cumulative Product Revenue");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.top);
}

Line stacked 100% chart

This sample creates a 100% stacked line chart showing percentage distribution over time.

A 100% stacked line chart showing traffic source distribution as percentages over time.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Month", "Email", "Social", "Direct"],
    ["Jan", 450, 320, 230],
    ["Feb", 480, 350, 270],
    ["Mar", 520, 380, 300],
    ["Apr", 560, 420, 320],
    ["May", 590, 450, 360],
    ["Jun", 630, 490, 380]
  ];
  const dataRange = sheet.getRange("A1:D7");
  dataRange.setValues(data);
  
  // Create 100% stacked line chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.lineStacked100,
    dataRange
  );
  chart.setPosition("A9");
  chart.getTitle().setText("Traffic Source Distribution Over Time");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Line with markers stacked chart

This sample creates a stacked line chart with markers.

A stacked line chart with markers showing cumulative quarterly sales across product categories.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Week", "Team A", "Team B", "Team C"],
    ["Week 1", 12, 8, 10],
    ["Week 2", 15, 10, 12],
    ["Week 3", 18, 13, 15],
    ["Week 4", 22, 16, 18],
    ["Week 5", 25, 19, 21]
  ];
  const dataRange = sheet.getRange("A1:D6");
  dataRange.setValues(data);
  
  // Create stacked line chart with markers.
  const chart = sheet.addChart(
    ExcelScript.ChartType.lineMarkersStacked,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Cumulative Team Performance");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

Line with markers stacked 100% chart

This sample creates a 100% stacked line chart with markers.

A 100% stacked line chart with markers showing traffic source distribution as percentages.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Product Line A", "Product Line B", "Product Line C"],
    ["Q1", 35, 40, 25],
    ["Q2", 38, 37, 25],
    ["Q3", 40, 35, 25],
    ["Q4", 42, 33, 25]
  ];
  const dataRange = sheet.getRange("A1:D5");
  dataRange.setValues(data);
  
  // Create 100% stacked line chart with markers.
  const chart = sheet.addChart(
    ExcelScript.ChartType.lineMarkersStacked100,
    dataRange
  );
  chart.setPosition("A7");
  chart.getTitle().setText("Product Line Market Share Trends");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Pie charts

Pie charts show proportional relationships in a dataset. Each value appears as a slice of the whole.

Pie chart

This sample creates a pie chart that shows market share distribution.

A pie chart displaying market share distribution with percentage labels for five companies.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data with multiple slices.
  const data = [
    ["Company", "Market Share"],
    ["Alpha Corp", 28.5],
    ["Beta Inc", 22.3],
    ["Gamma LLC", 18.7],
    ["Delta Co", 15.2],
    ["Others", 15.3]
  ];
  const dataRange = sheet.getRange("A1:B6");
  dataRange.setValues(data);
  
  // Create pie chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pie,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Market Share Distribution");
  
  // Customize pie chart.
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
  
  // Add data labels showing percentages.
  const series = chart.getSeries()[0];
  series.setHasDataLabels(true);
  series.getDataLabels().setShowPercentage(true);
  series.getDataLabels().setShowSeriesName(false);
  series.getDataLabels().setShowCategoryName(false);
  series.getDataLabels().setShowValue(false);
}

Exploded pie chart

This sample creates an exploded pie chart with separated slices for emphasis.

An exploded pie chart showing monthly budget breakdown with separated slices for housing, transportation, food, and other expenses.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Expense Category", "Amount"],
    ["Housing", 1800],
    ["Transportation", 650],
    ["Food", 550],
    ["Utilities", 200],
    ["Entertainment", 300],
    ["Savings", 500]
  ];
  const dataRange = sheet.getRange("A1:B7");
  dataRange.setValues(data);
  
  // Create exploded pie chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pieExploded,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Monthly Budget Breakdown");
  
  // Customize.
  const series = chart.getSeries()[0];
  series.setHasDataLabels(true);
  series.getDataLabels().setShowCategoryName(true);
  series.getDataLabels().setShowValue(true);
  series.getDataLabels().setPosition(ExcelScript.ChartDataLabelPosition.bestFit);
}

Doughnut charts

Doughnut charts are similar to pie charts but can display multiple data series and have a hole in the center.

Doughnut chart

A doughnut chart displaying revenue by category with percentage labels for hardware, software, services, training, and support.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Category", "2024"],
    ["Hardware", 45000],
    ["Software", 32000],
    ["Services", 28000],
    ["Training", 15000],
    ["Support", 20000]
  ];
  const dataRange = sheet.getRange("A1:B6");
  dataRange.setValues(data);
  
  // Create doughnut chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.doughnut,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Revenue by Category");
  
  // Customize doughnut chart.
  const series = chart.getSeries()[0];
  series.setHasDataLabels(true);
  series.getDataLabels().setShowPercentage(true);
  series.getDataLabels().setShowLeaderLines(true);
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Exploded doughnut chart

An exploded doughnut chart showing regional sales distribution with separated segments for different geographical regions.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Region", "Sales %"],
    ["North America", 35.2],
    ["Europe", 28.7],
    ["Asia Pacific", 22.3],
    ["Latin America", 8.5],
    ["Others", 5.3]
  ];
  const dataRange = sheet.getRange("A1:B6");
  dataRange.setValues(data);
  
  // Create exploded doughnut chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.doughnutExploded,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Regional Sales Distribution");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

Area charts

Area charts emphasize the magnitude of change over time and show the cumulative total.

Area chart

An area chart showing monthly revenue trends with a filled area under the line.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Month", "Revenue"],
    ["Jan", 45000],
    ["Feb", 52000],
    ["Mar", 48000],
    ["Apr", 61000],
    ["May", 58000],
    ["Jun", 67000]
  ];
  const dataRange = sheet.getRange("A1:B7");
  dataRange.setValues(data);
  
  // Create area chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.area,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Monthly Revenue Trend");
  
  // Customize area chart.
  chart.getAxes().getValueAxis().setDisplayUnit(
    ExcelScript.ChartAxisDisplayUnit.thousands
  );
}

Stacked area chart

A stacked area chart displaying renewable energy production by source (solar, wind, hydro, geothermal) over five years.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["", "Solar", "Wind", "Hydro", "Geothermal"],
    ["2020", 150, 120, 200, 30],
    ["2021", 180, 145, 205, 35],
    ["2022", 220, 175, 210, 40],
    ["2023", 270, 210, 215, 48],
    ["2024", 330, 250, 220, 55]
  ];
  const dataRange = sheet.getRange("A1:E6");
  dataRange.setValues(data);
  
  // Create stacked area chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.areaStacked,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Renewable Energy Production (TWh)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.top);
}

100% stacked area chart

This sample creates a 100% stacked area chart showing percentage distribution over time.

A 100% stacked area chart showing renewable energy mix as percentage distribution over time.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
    const data = [
    ["", "Solar", "Wind", "Hydro", "Geothermal"],
    ["2020", 150, 120, 200, 30],
    ["2021", 180, 145, 205, 35],
    ["2022", 220, 175, 210, 40],
    ["2023", 270, 210, 215, 48],
    ["2024", 330, 250, 220, 55]
  ];
  const dataRange = sheet.getRange("A1:E6");
  dataRange.setValues(data);
  
  // Create 100% stacked area chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.areaStacked100,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Renewable Energy Mix (% Distribution)");
  
  // Label the series with energy source names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("Solar");
  seriesCollection[1].setName("Wind");
  seriesCollection[2].setName("Hydro");
  seriesCollection[3].setName("Geothermal");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.top);
}

Scatter (XY) charts

Scatter charts show relationships between two numerical variables. Use them for correlation analysis.

Scatter chart

A scatter chart showing the relationship between study hours and test scores.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Study Hours", "Test Score"],
    [2, 65],
    [3, 68],
    [4, 72],
    [5, 75],
    [5.5, 78],
    [6, 82],
    [7, 85],
    [7.5, 88],
    [8, 90],
    [9, 92],
    [10, 95]
  ];
  const dataRange = sheet.getRange("A1:B12");
  dataRange.setValues(data);
  
  // Create scatter chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.xyscatter,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Study Hours vs Test Scores");
  
  // Customize scatter chart.
  chart.getAxes().getCategoryAxis().setDisplayUnit(ExcelScript.ChartAxisDisplayUnit.none);
  chart.getAxes().getValueAxis().setMinimum(0);
  chart.getAxes().getValueAxis().setMaximum(100);
  
  // Remove legend as there's only one series.
  chart.getLegend().setVisible(false);
}

Scatter with lines chart

A scatter chart with connecting lines showing ice cream sales versus temperature.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Temperature (°C)", "Sales ($)"],
    [15, 2500],
    [18, 2800],
    [22, 3200],
    [25, 3800],
    [28, 4500],
    [32, 5200],
    [35, 5800],
    [38, 6100]
  ];
  const dataRange = sheet.getRange("A1:B9");
  dataRange.setValues(data);
  
  // Create scatter chart with lines.
  const chart = sheet.addChart(
    ExcelScript.ChartType.xyscatterLines,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Ice Cream Sales vs Temperature");
  
  chart.getLegend().setVisible(false);
}

Scatter with smooth lines chart

A scatter chart with smooth curved lines comparing growth patterns of two series.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["X", "Series 1", "Series 2"],
    [1, 10, 15],
    [2, 15, 18],
    [3, 25, 22],
    [4, 40, 28],
    [5, 60, 35],
    [6, 85, 43],
    [7, 115, 52]
  ];
  const dataRange = sheet.getRange("A1:C8");
  dataRange.setValues(data);
  
  // Create scatter chart with smooth lines.
  const chart = sheet.addChart(
    ExcelScript.ChartType.xyscatterSmooth,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Growth Comparison");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Scatter with lines (no markers) chart

This sample creates a scatter chart with connecting lines but no data point markers.

A scatter chart with connecting lines showing distance over time without data point markers.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Time (hours)", "Distance (miles)"],
    [0, 0],
    [1, 55],
    [2, 105],
    [3, 160],
    [4, 210],
    [5, 265],
    [6, 315]
  ];
  const dataRange = sheet.getRange("A1:B8");
  dataRange.setValues(data);
  
  // Create scatter chart with lines but no markers.
  const chart = sheet.addChart(
    ExcelScript.ChartType.xyscatterLinesNoMarkers,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Travel Distance Over Time");
  
  chart.getLegend().setVisible(false);
}

Scatter with smooth lines (no markers) chart

This sample creates a scatter chart with smooth connecting lines but no data point markers.

A scatter chart with smooth curved lines showing distance over time without data point markers.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Input", "Output"],
    [1, 5],
    [2, 12],
    [3, 22],
    [4, 35],
    [5, 51],
    [6, 70],
    [7, 92]
  ];
  const dataRange = sheet.getRange("A1:B8");
  dataRange.setValues(data);
  
  // Create scatter chart with smooth lines but no markers.
  const chart = sheet.addChart(
    ExcelScript.ChartType.xyscatterSmoothNoMarkers,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Response Curve Analysis");
  
  chart.getLegend().setVisible(false);
}

Bubble charts

Bubble charts display three dimensions of data: X and Y position plus bubble size.

Bubble chart

A bubble chart showing product analysis with price, quality score, and market share represented by bubble size.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data for bubble chart.
  // Each product is a separate data series with X, Y, and Size values.
  const data = [
    ["Product", "Price ($)", "Quality Score", "Market Share"],
    ["Laptops", 150, 85, 25],
    ["Tablets", 200, 90, 40],
    ["Phones", 100, 75, 15],
    ["Monitors", 250, 92, 35],
    ["Keyboards", 175, 88, 30],
    ["Mice", 120, 80, 20]
  ];
  const dataRange = sheet.getRange("A1:D7");
  dataRange.setValues(data);
  
  // Create bubble chart - manually add each series.
  const chart = sheet.addChart(
    ExcelScript.ChartType.bubble,
    sheet.getRange("B1:D1") // Start with just headers to create empty chart.
  );
  chart.setPosition("A9");
  chart.getTitle().setText("Product Analysis: Price vs Quality (Market Share)");
  
  // Remove any default series that were created.
  while (chart.getSeries().length > 0) {
    chart.getSeries()[0].delete();
  }
  
  // Add each product as its own series.
  for (let i = 2; i <= 7; i++) {
    const productName = sheet.getRange(`A${ i } `).getValue() as string;
    const newSeries = chart.addChartSeries();
    
    newSeries.setName(productName);
    newSeries.setXAxisValues(sheet.getRange(`B${ i }:B${ i } `));
    newSeries.setValues(sheet.getRange(`C${ i }:C${ i } `));
    newSeries.setBubbleSizes(sheet.getRange(`D${ i }:D${ i } `));
  }
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

3D bubble chart

A 3D bubble chart comparing cities by population, GDP per capita, and area represented by bubble size.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data for 3D bubble chart.
  // Each city is a separate data series with X, Y, and Size values.
  const data = [
    ["City", "Population (millions)", "GDP per Capita ($k)", "Area (km²)"],
    ["Tokyo", 8.5, 65, 300],
    ["Berlin", 3.2, 58, 150],
    ["Sydney", 5.8, 72, 250],
    ["Toronto", 2.1, 52, 100],
    ["Singapore", 4.5, 68, 180]
  ];
  const dataRange = sheet.getRange("A1:D6");
  dataRange.setValues(data);
  
  // Create 3D bubble chart - manually add each series.
  const chart = sheet.addChart(
    ExcelScript.ChartType.bubble3DEffect,
    sheet.getRange("B1:D1") // Start with just headers to create empty chart.
  );
  chart.setPosition("A8");
  chart.getTitle().setText("City Comparison: Population vs GDP per Capita (Area)");
  
  // Remove any default series that were created.
  while (chart.getSeries().length > 0) {
    chart.getSeries()[0].delete();
  }
  
  // Add each city as its own series.
  for (let i = 2; i <= 6; i++) {
    const cityName = sheet.getRange(`A${ i } `).getValue() as string;
    const newSeries = chart.addChartSeries();
    
    newSeries.setName(cityName);
    newSeries.setXAxisValues(sheet.getRange(`B${ i }:B${ i } `));
    newSeries.setValues(sheet.getRange(`C${ i }:C${ i } `));
    newSeries.setBubbleSizes(sheet.getRange(`D${ i }:D${ i } `));
  }
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Stock charts

Stock charts display financial data with high, low, and close values. They can also include open and volume values.

Stock HLC chart

This sample creates a High-Low-Close stock chart.

A High-Low-Close stock chart showing stock price movements with high, low, and close values for five trading days.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data (Date, High, Low, Close).
  const data = [
    ["Date", "High", "Low", "Close"],
    ["1/1/2024", 152.50, 148.20, 151.00],
    ["1/2/2024", 153.80, 150.50, 152.30],
    ["1/3/2024", 154.20, 151.80, 153.50],
    ["1/4/2024", 155.00, 152.30, 153.80],
    ["1/5/2024", 156.50, 153.50, 155.20]
  ];
  const dataRange = sheet.getRange("A1:D6");
  dataRange.setValues(data);
  
  // Create HLC stock chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.stockHLC,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Stock Price Movement (HLC)");
  
  // Customize stock chart.
  chart.getAxes().getValueAxis().setMinimum(145);
  chart.getAxes().getValueAxis().setMaximum(160);
}

Stock OHLC chart

This sample creates an Open-High-Low-Close stock chart.

An Open-High-Low-Close stock chart displaying stock price movements with open, high, low, and close values.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data (Date, Open, High, Low, Close).
  const data = [
    ["Date", "Open", "High", "Low", "Close"],
    ["1/1/2024", 150.00, 152.50, 148.20, 151.00],
    ["1/2/2024", 151.00, 153.80, 150.50, 152.30],
    ["1/3/2024", 152.30, 154.20, 151.80, 153.50],
    ["1/4/2024", 153.50, 155.00, 152.30, 153.80],
    ["1/5/2024", 153.80, 156.50, 153.50, 155.20]
  ];
  const dataRange = sheet.getRange("A1:E6");
  dataRange.setValues(data);
  
  // Create OHLC stock chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.stockOHLC,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Stock Price Movement (OHLC)");
  
  chart.getAxes().getValueAxis().setMinimum(145);
  chart.getAxes().getValueAxis().setMaximum(160);
}

Stock VHLC chart

This sample creates a Volume-High-Low-Close stock chart.

A Volume-High-Low-Close stock chart showing trading volume alongside price movements.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data (Date, Volume, High, Low, Close).
  const data = [
    ["Date", "Volume", "High", "Low", "Close"],
    ["1/1/2024", 2500000, 152.50, 148.20, 151.00],
    ["1/2/2024", 3200000, 153.80, 150.50, 152.30],
    ["1/3/2024", 2800000, 154.20, 151.80, 153.50],
    ["1/4/2024", 3500000, 155.00, 152.30, 153.80],
    ["1/5/2024", 4100000, 156.50, 153.50, 155.20]
  ];
  const dataRange = sheet.getRange("A1:E6");
  dataRange.setValues(data);
  
  // Create VHLC stock chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.stockVHLC,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Stock Price with Volume (VHLC)");
  
  // Customize to improve visibility of stock lines against volume bars.
  chart.getAxes().getValueAxis().setMinimum(145);
  chart.getAxes().getValueAxis().setMaximum(160);
  
  // Make the volume bars more transparent or lighter colored.
  const volumeSeries = chart.getSeries()[0];
  volumeSeries.getFormat().getFill().setSolidColor("#B0C4DE"); // Light steel blue.
}

Stock VOHLC chart

This sample creates a Volume-Open-High-Low-Close stock chart.

A Volume-Open-High-Low-Close stock chart displaying complete stock analysis with volume and all price points.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data (Date, Volume, Open, High, Low, Close).
  const data = [
    ["Date", "Volume", "Open", "High", "Low", "Close"],
    ["1/1/2024", 2500000, 150.00, 152.50, 148.20, 151.00],
    ["1/2/2024", 3200000, 151.00, 153.80, 150.50, 152.30],
    ["1/3/2024", 2800000, 152.30, 154.20, 151.80, 153.50],
    ["1/4/2024", 3500000, 153.50, 155.00, 152.30, 153.80],
    ["1/5/2024", 4100000, 153.80, 156.50, 153.50, 155.20]
  ];
  const dataRange = sheet.getRange("A1:F6");
  dataRange.setValues(data);
  
  // Create VOHLC stock chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.stockVOHLC,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Complete Stock Analysis (VOHLC)");
  
  // Customize to improve visibility of stock lines against volume bars.
  chart.getAxes().getValueAxis().setMinimum(145);
  chart.getAxes().getValueAxis().setMaximum(160);
  
  // Make the volume bars more transparent or lighter colored.
  const volumeSeries = chart.getSeries()[0];
  volumeSeries.getFormat().getFill().setSolidColor("#B0C4DE"); // Light steel blue.
}

Radar charts

Radar charts display multivariate data on axes that start from the same point. They're useful for comparing multiple variables.

Radar chart

A radar chart comparing multiple attributes of two products across six dimensions.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Attribute", "Product A", "Product B"],
    ["Speed", 8, 6],
    ["Reliability", 9, 8],
    ["Cost", 6, 9],
    ["Features", 7, 8],
    ["Support", 8, 7],
    ["Ease of Use", 9, 9]
  ];
  const dataRange = sheet.getRange("A1:C7");
  dataRange.setValues(data);
  
  // Create radar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.radar,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Product Comparison Radar");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Radar with markers chart

A radar chart with markers showing developer skill assessments across different technologies.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Skill", "Danaite Alemseged", "Fazekas Peter", "Jeffry Goh"],
    ["JavaScript", 9, 7, 8],
    ["Python", 7, 9, 6],
    ["SQL", 8, 8, 9],
    ["Cloud", 8, 6, 7],
    ["DevOps", 6, 8, 9]
  ];
  const dataRange = sheet.getRange("A1:D6");
  dataRange.setValues(data);
  
  // Create radar chart with markers.
  const chart = sheet.addChart(
    ExcelScript.ChartType.radarMarkers,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Developer Skill Assessment");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

Filled radar chart

A filled radar chart comparing current performance versus target metrics across six categories.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data - Target first, then Current so Current is drawn on top.
  const data = [
    ["Category", "Target", "Current"],
    ["Customer Satisfaction", 9.0, 7.5],
    ["Product Quality", 9.5, 8.2],
    ["Delivery Speed", 9.0, 6.8],
    ["Price Competitiveness", 8.5, 7.0],
    ["Innovation", 9.5, 8.5],
    ["Market Presence", 9.0, 7.2]
  ];
  const dataRange = sheet.getRange("A1:C7");
  dataRange.setValues(data);
  
  // Create filled radar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.radarFilled,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Performance vs Target Metrics");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Treemap charts

Treemap charts display hierarchical data as nested rectangles, with size representing values.

A treemap chart showing sales by category and subcategory with nested rectangles sized by value.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Category", "Subcategory", "Value"],
    ["Electronics", "Phones", 45000],
    ["Electronics", "Laptops", 38000],
    ["Electronics", "Tablets", 22000],
    ["Furniture", "Desks", 18000],
    ["Furniture", "Chairs", 25000],
    ["Furniture", "Storage", 12000],
    ["Clothing", "Shirts", 15000],
    ["Clothing", "Pants", 18000],
    ["Clothing", "Accessories", 8000]
  ];
  const dataRange = sheet.getRange("A1:C10");
  dataRange.setValues(data);
  
  // Create treemap chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.treemap,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Sales by Category (Treemap)");
  
  // Treemap-specific customization.
  chart.getLegend().setVisible(false);
}

Sunburst charts

Sunburst charts display hierarchical data in concentric circles, with each level represented by a ring.

A sunburst chart displaying organizational revenue breakdown with hierarchical levels shown in concentric rings.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Level 1", "Level 2", "Level 3", "Value"],
    ["Sales", "North America", "USA", 125000],
    ["Sales", "North America", "Canada", 35000],
    ["Sales", "Europe", "UK", 45000],
    ["Sales", "Europe", "Germany", 52000],
    ["Sales", "Europe", "France", 38000],
    ["Marketing", "Digital", "Social Media", 28000],
    ["Marketing", "Digital", "Email", 15000],
    ["Marketing", "Traditional", "Print", 12000],
    ["Marketing", "Traditional", "TV", 35000]
  ];
  const dataRange = sheet.getRange("A1:D10");
  dataRange.setValues(data);
  
  // Create sunburst chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.sunburst,
    dataRange
  );
  chart.setPosition("E1");
  chart.getTitle().setText("Organizational Revenue Breakdown");
  
  chart.getLegend().setVisible(false);
}

Waterfall charts

Waterfall charts show how an initial value is affected by positive and negative values, displaying the cumulative effect.

A waterfall chart showing profit and loss analysis with starting balance, revenue, expenses, and ending balance.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Category", "Amount"],
    ["Starting Balance", 50000],
    ["Revenue", 125000],
    ["Cost of Goods", -45000],
    ["Operating Expenses", -32000],
    ["Marketing", -15000],
    ["Taxes", -18000],
    ["Ending Balance", 65000]
  ];
  const dataRange = sheet.getRange("A1:B8");
  dataRange.setValues(data);
  
  // Create waterfall chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.waterfall,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Profit & Loss Analysis");
  
  // Waterfall charts automatically handle the flow visualization.
  chart.getLegend().setVisible(false);
}

Funnel charts

Funnel charts show progressive reduction of data through stages. Use them for sales and conversion analysis.

A funnel chart displaying sales conversion stages from website visitors to completed purchases.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Stage", "Count"],
    ["Website Visitors", 10000],
    ["Product Page Views", 4500],
    ["Add to Cart", 1200],
    ["Started Checkout", 800],
    ["Completed Purchase", 450]
  ];
  const dataRange = sheet.getRange("A1:B6");
  dataRange.setValues(data);
  
  // Create funnel chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.funnel,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Sales Funnel Conversion");
}

Box and whisker charts

Box and whisker charts show the distribution of data through quartiles. They highlight the median and outliers.

A box and whisker chart showing response time distribution by region with quartiles and outliers.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data (multiple observations per category).
  const data = [
    ["Region", "Response Time (ms)"],
    ["North", 245],
    ["North", 268],
    ["North", 232],
    ["North", 289],
    ["North", 251],
    ["South", 312],
    ["South", 298],
    ["South", 334],
    ["South", 305],
    ["South", 321],
    ["East", 198],
    ["East", 215],
    ["East", 187],
    ["East", 223],
    ["East", 206],
    ["West", 267],
    ["West", 281],
    ["West", 254],
    ["West", 273],
    ["West", 269]
  ];
  const dataRange = sheet.getRange("A1:B21");
  dataRange.setValues(data);
  
  // Create box and whisker chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.boxwhisker,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Response Time Distribution by Region");
  
  chart.getLegend().setVisible(false);
}

Histogram charts

Histogram charts display the distribution of numerical data by grouping values into bins.

A histogram chart showing customer age distribution with automatically determined bin ranges.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data (customer ages).
  const data = [
    ["Customer", "Age"],
    ["Customer 1", 23],
    ["Customer 2", 45],
    ["Customer 3", 31],
    ["Customer 4", 52],
    ["Customer 5", 28],
    ["Customer 6", 67],
    ["Customer 7", 38],
    ["Customer 8", 41],
    ["Customer 9", 29],
    ["Customer 10", 55],
    ["Customer 11", 33],
    ["Customer 12", 48],
    ["Customer 13", 26],
    ["Customer 14", 62],
    ["Customer 15", 35],
    ["Customer 16", 44],
    ["Customer 17", 58],
    ["Customer 18", 37],
    ["Customer 19", 49],
    ["Customer 20", 71],
    ["Customer 21", 24],
    ["Customer 22", 39],
    ["Customer 23", 56],
    ["Customer 24", 42],
    ["Customer 25", 64]
  ];
  const dataRange = sheet.getRange("A1:B26");
  dataRange.setValues(data);
  
  // Create histogram chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.histogram,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Customer Age Distribution");
  chart.getLegend().setVisible(false);
}

Pareto charts

Pareto charts combine column and line charts to show both individual values and cumulative totals. They follow the 80/20 principle.

A pareto chart analyzing defect types with columns showing frequency and a line showing cumulative percentage.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Defect Type", "Frequency"],
    ["Packaging", 45],
    ["Assembly", 32],
    ["Quality Control", 28],
    ["Material", 18],
    ["Design", 12],
    ["Shipping", 8],
    ["Documentation", 5],
    ["Other", 3]
  ];
  const dataRange = sheet.getRange("A1:B9");
  dataRange.setValues(data);
  
  // Create pareto chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pareto,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Defect Analysis (Pareto)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Surface charts

Surface charts display trends in values across two dimensions in a continuous curve. They're useful for finding optimal combinations.

Surface chart

A 3D surface chart displaying temperature distribution across two-dimensional coordinates.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data (temperature at different coordinates).
  const data = [
    ["", "0", "5", "10", "15", "20"],
    ["0", 20, 22, 25, 28, 30],
    ["5", 22, 24, 27, 30, 32],
    ["10", 25, 27, 30, 33, 35],
    ["15", 28, 30, 33, 36, 38],
    ["20", 30, 32, 35, 38, 40]
  ];
  const dataRange = sheet.getRange("A1:F6");
  dataRange.setValues(data);
  
  // Create surface chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.surface,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Temperature Distribution (3D Surface)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

Surface wireframe chart

A wireframe surface chart showing data surface with grid lines and no fill.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["", "A", "B", "C", "D", "E"],
    ["1", 10, 15, 20, 15, 10],
    ["2", 15, 25, 35, 25, 15],
    ["3", 20, 35, 50, 35, 20],
    ["4", 15, 25, 35, 25, 15],
    ["5", 10, 15, 20, 15, 10]
  ];
  const dataRange = sheet.getRange("A1:F6");
  dataRange.setValues(data);
  
  // Create surface wireframe chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.surfaceWireframe,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Data Surface (Wireframe)");
  
  chart.getLegend().setVisible(false);
}

Contour chart (Surface top view)

A contour chart displaying signal strength as a top-down view with color-coded regions.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["", "0°", "45°", "90°", "135°", "180°"],
    ["0m", 100, 95, 85, 92, 98],
    ["10m", 95, 88, 75, 85, 93],
    ["20m", 85, 78, 62, 75, 83],
    ["30m", 92, 85, 75, 82, 90],
    ["40m", 98, 93, 83, 90, 96]
  ];
  const dataRange = sheet.getRange("A1:F6");
  dataRange.setValues(data);
  
  // Create contour (top view) chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.surfaceTopView,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Signal Strength Map (Contour)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

Contour chart wireframe (Surface top view wireframe)

This sample creates a wireframe version of a contour chart.

A wireframe contour chart showing signal strength as a top-down view with grid lines and no fill.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["", "0°", "45°", "90°", "135°", "180°"],
    ["0m", 100, 95, 85, 92, 98],
    ["10m", 95, 88, 75, 85, 93],
    ["20m", 85, 78, 62, 75, 83],
    ["30m", 92, 85, 75, 82, 90],
    ["40m", 98, 93, 83, 90, 96]
  ];
  const dataRange = sheet.getRange("A1:F6");
  dataRange.setValues(data);
  
  // Create contour wireframe chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.surfaceTopViewWireframe,
    dataRange
  );
  chart.setPosition("A8");
  chart.getTitle().setText("Signal Strength Map (Contour Wireframe)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

Region map charts

Region map charts, also called filled map charts, display values across geographical regions.

A region map chart showing sales by state with color-coded geographical regions.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data (state names and values).
  const data = [
    ["State", "Sales"],
    ["California", 450000],
    ["Texas", 380000],
    ["Florida", 320000],
    ["New York", 410000],
    ["Illinois", 280000],
    ["Pennsylvania", 240000],
    ["Ohio", 220000],
    ["Georgia", 195000],
    ["North Carolina", 185000],
    ["Michigan", 175000]
  ];
  const dataRange = sheet.getRange("A1:B11");
  dataRange.setValues(data);
  
  // Create region map chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.regionMap,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Sales by State");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

Combo charts (Bar/Pie combination)

Bar of pie chart

Bar of pie charts break out smaller slices from a pie chart into a separate bar for better visibility.

A bar of pie chart showing category distribution with smaller slices expanded into a separate bar.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Category", "Amount"],
    ["Category A", 45],
    ["Category B", 30],
    ["Category C", 15],
    ["Category D", 4],
    ["Category E", 3],
    ["Category F", 2],
    ["Category G", 1]
  ];
  const dataRange = sheet.getRange("A1:B8");
  dataRange.setValues(data);
  
  // Create bar of pie chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.barOfPie,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Category Distribution (Bar of Pie)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Pie of pie chart

Pie of pie charts display a secondary pie chart that shows details of smaller slices.

A pie of pie chart showing market segment analysis with a secondary pie expanding smaller segments.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Segment", "Value"],
    ["Enterprise", 425000],
    ["Small Business", 285000],
    ["Consumer", 190000],
    ["Education", 65000],
    ["Government", 55000],
    ["Non-Profit", 30000]
  ];
  const dataRange = sheet.getRange("A1:B7");
  dataRange.setValues(data);
  
  // Create pie of pie chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pieOfPie,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Market Segment Analysis (Pie of Pie)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.right);
}

3D chart variations

These chart types display data with three-dimensional visual effects using cone, cylinder, and pyramid shapes.

Cone column charts

Cone column chart

A 3D cone column chart showing quarterly performance with cone-shaped columns.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Target", "Achieved"],
    ["Q1", 100000, 95000],
    ["Q2", 120000, 125000],
    ["Q3", 130000, 128000],
    ["Q4", 150000, 158000]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create cone column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.coneCol,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Quarterly Performance (3D Cone)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Clustered cone column chart

A clustered 3D cone column chart comparing target and achieved values side by side.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Target", "Achieved"],
    ["Q1", 100000, 95000],
    ["Q2", 120000, 125000],
    ["Q3", 130000, 128000],
    ["Q4", 150000, 158000]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create clustered cone column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.coneColClustered,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Quarterly Performance (Clustered 3D Cone)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Stacked cone column chart

A stacked 3D cone column chart showing quarterly performance with stacked cone-shaped columns.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Target", "Achieved"],
    ["Q1", 100000, 95000],
    ["Q2", 120000, 125000],
    ["Q3", 130000, 128000],
    ["Q4", 150000, 158000]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create stacked cone column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.coneColStacked,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Quarterly Performance (Stacked 3D Cone)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

100% stacked cone column chart

A 100% stacked 3D cone column chart showing quarterly performance as percentages.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Target", "Achieved"],
    ["Q1", 100000, 95000],
    ["Q2", 120000, 125000],
    ["Q3", 130000, 128000],
    ["Q4", 150000, 158000]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create 100% stacked cone column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.coneColStacked100,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Quarterly Performance (100% Stacked 3D Cone)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Cylinder column charts

Cylinder column chart

A 3D cylinder column chart displaying product sales with cylindrical columns.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Product", "Units Sold"],
    ["Laptops", 850],
    ["Tablets", 720],
    ["Phones", 640],
    ["Monitors", 580]
  ];
  const dataRange = sheet.getRange("A1:B5");
  dataRange.setValues(data);
  
  // Create cylinder column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.cylinderCol,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Product Sales (3D Cylinder)");
  
  chart.getLegend().setVisible(false);
}

Clustered cylinder column chart

A clustered 3D cylinder column chart comparing product sales across multiple years.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Product", "2023", "2024"],
    ["Laptops", 850, 920],
    ["Tablets", 720, 780],
    ["Phones", 640, 710],
    ["Monitors", 580, 650]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create clustered cylinder column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.cylinderColClustered,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Product Sales by Year (Clustered 3D Cylinder)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Stacked cylinder column chart

A stacked 3D cylinder column chart showing product sales with stacked cylindrical columns.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Product", "2023", "2024"],
    ["Laptops", 850, 920],
    ["Tablets", 720, 780],
    ["Phones", 640, 710],
    ["Monitors", 580, 650]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create stacked cylinder column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.cylinderColStacked,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Product Sales by Year (Stacked 3D Cylinder)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

100% stacked cylinder column chart

A 100% stacked 3D cylinder column chart showing product sales as percentages.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Product", "2023", "2024"],
    ["Laptops", 850, 920],
    ["Tablets", 720, 780],
    ["Phones", 640, 710],
    ["Monitors", 580, 650]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create 100% stacked cylinder column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.cylinderColStacked100,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Product Sales by Year (100% Stacked 3D Cylinder)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Pyramid column charts

Pyramid column chart

A 3D pyramid column chart showing organizational hierarchy with pyramid-shaped columns.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Level", "Headcount"],
    ["Executive", 5],
    ["Senior Management", 25],
    ["Middle Management", 120],
    ["Staff", 450]
  ];
  const dataRange = sheet.getRange("A1:B5");
  dataRange.setValues(data);
  
  // Create pyramid column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pyramidCol,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Organizational Hierarchy (3D Pyramid)");
  
  chart.getLegend().setVisible(false);
}

Clustered pyramid column chart

A clustered 3D pyramid column chart comparing organizational hierarchy across multiple years.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Level", "2023", "2024"],
    ["Executive", 5, 6],
    ["Senior Management", 25, 28],
    ["Middle Management", 120, 135],
    ["Staff", 450, 480]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create clustered pyramid column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pyramidColClustered,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Organizational Hierarchy by Year (Clustered 3D Pyramid)");
  
  // Label the series with year names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("2023");
  seriesCollection[1].setName("2024");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Stacked pyramid column chart

A stacked 3D pyramid column chart showing organizational hierarchy with stacked pyramid-shaped columns.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Level", "2023", "2024"],
    ["Executive", 5, 6],
    ["Senior Management", 25, 28],
    ["Middle Management", 120, 135],
    ["Staff", 450, 480]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create stacked pyramid column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pyramidColStacked,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Organizational Hierarchy by Year (Stacked 3D Pyramid)");
  
  // Label the series with year names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("2023");
  seriesCollection[1].setName("2024");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

100% stacked pyramid column chart

A 100% stacked 3D pyramid column chart showing organizational hierarchy as percentages.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Level", "2023", "2024"],
    ["Executive", 5, 6],
    ["Senior Management", 25, 28],
    ["Middle Management", 120, 135],
    ["Staff", 450, 480]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create 100% stacked pyramid column chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pyramidColStacked100,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Organizational Hierarchy by Year (100% Stacked 3D Pyramid)");
  
  // Label the series with year names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("2023");
  seriesCollection[1].setName("2024");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Cone bar charts

Clustered cone bar chart

A clustered 3D cone bar chart comparing target and achieved values side by side.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Target", "Achieved"],
    ["Q1", 100000, 95000],
    ["Q2", 120000, 125000],
    ["Q3", 130000, 128000],
    ["Q4", 150000, 158000]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create clustered cone bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.coneBarClustered,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Quarterly Performance (Clustered 3D Cone Bar)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Stacked cone bar chart

A stacked 3D cone bar chart showing quarterly revenue by source with stacked cone-shaped bars.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Product Sales", "Services"],
    ["Q1", 65000, 35000],
    ["Q2", 70000, 55000],
    ["Q3", 68000, 60000],
    ["Q4", 72000, 86000]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create stacked cone bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.coneBarStacked,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Quarterly Revenue by Source (Stacked 3D Cone Bar)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

100% stacked cone bar chart

A 100% stacked 3D cone bar chart showing revenue mix by quarter as percentages.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Quarter", "Product Sales", "Services"],
    ["Q1", 65000, 35000],
    ["Q2", 70000, 55000],
    ["Q3", 68000, 60000],
    ["Q4", 72000, 86000]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create 100% stacked cone bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.coneBarStacked100,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Revenue Mix by Quarter (100% Stacked 3D Cone Bar)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Cylinder bar charts

Clustered cylinder bar chart

A clustered 3D cylinder bar chart comparing product sales across multiple years.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Product", "2023", "2024"],
    ["Laptops", 850, 920],
    ["Tablets", 720, 780],
    ["Phones", 640, 710],
    ["Monitors", 580, 650]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create clustered cylinder bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.cylinderBarClustered,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Product Sales by Year (Clustered 3D Cylinder Bar)");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Stacked cylinder bar chart

A stacked 3D cylinder bar chart showing product sales with stacked cylindrical bars.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Product", "2023", "2024"],
    ["Laptops", 850, 920],
    ["Tablets", 720, 780],
    ["Phones", 640, 710],
    ["Monitors", 580, 650]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create stacked cylinder bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.cylinderBarStacked,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Product Sales by Year (Stacked 3D Cylinder Bar)");
  
  // Label the series with year names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("2023");
  seriesCollection[1].setName("2024");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

100% stacked cylinder bar chart

A 100% stacked 3D cylinder bar chart showing product sales as percentages.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Product", "2023", "2024"],
    ["Laptops", 850, 920],
    ["Tablets", 720, 780],
    ["Phones", 640, 710],
    ["Monitors", 580, 650]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create 100% stacked cylinder bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.cylinderBarStacked100,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Product Sales by Year (100% Stacked 3D Cylinder Bar)");
  
  // Label the series with year names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("2023");
  seriesCollection[1].setName("2024");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Pyramid bar charts

Clustered pyramid bar chart

A clustered 3D pyramid bar chart comparing organizational hierarchy across multiple years.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Level", "2023", "2024"],
    ["Executive", 5, 6],
    ["Senior Management", 25, 28],
    ["Middle Management", 120, 135],
    ["Staff", 450, 480]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create clustered pyramid bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pyramidBarClustered,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Organizational Hierarchy by Year (Clustered 3D Pyramid Bar)");
  
  // Label the series with year names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("2023");
  seriesCollection[1].setName("2024");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Stacked pyramid bar chart

A stacked 3D pyramid bar chart showing organizational hierarchy with stacked pyramid-shaped bars.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Level", "2023", "2024"],
    ["Executive", 5, 6],
    ["Senior Management", 25, 28],
    ["Middle Management", 120, 135],
    ["Staff", 450, 480]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create stacked pyramid bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pyramidBarStacked,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Organizational Hierarchy by Year (Stacked 3D Pyramid Bar)");
  
  // Label the series with year names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("2023");
  seriesCollection[1].setName("2024");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

100% stacked pyramid bar chart

A 100% stacked 3D pyramid bar chart showing organizational hierarchy as percentages.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Level", "2023", "2024"],
    ["Executive", 5, 6],
    ["Senior Management", 25, 28],
    ["Middle Management", 120, 135],
    ["Staff", 450, 480]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create 100% stacked pyramid bar chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.pyramidBarStacked100,
    dataRange
  );
  chart.setPosition("D1");
  chart.getTitle().setText("Organizational Hierarchy by Year (100% Stacked 3D Pyramid Bar)");
  
  // Label the series with year names.
  const seriesCollection = chart.getSeries();
  seriesCollection[0].setName("2023");
  seriesCollection[1].setName("2024");
  
  chart.getLegend().setPosition(ExcelScript.ChartLegendPosition.bottom);
}

Working with chart elements

This sample demonstrates how to customize various chart elements that apply across all chart types.

function main(workbook: ExcelScript.Workbook) {
  const sheet = workbook.getActiveWorksheet();
  
  // Add sample data.
  const data = [
    ["Month", "Revenue", "Expenses"],
    ["Jan", 45000, 32000],
    ["Feb", 52000, 35000],
    ["Mar", 48000, 33000],
    ["Apr", 61000, 38000]
  ];
  const dataRange = sheet.getRange("A1:C5");
  dataRange.setValues(data);
  
  // Create chart.
  const chart = sheet.addChart(
    ExcelScript.ChartType.columnClustered,
    dataRange
  );
  chart.setPosition("E1");
  
  // Customize chart title.
  chart.getTitle().setText("Monthly Financial Overview");
  const chartTitle = chart.getTitle();
  chartTitle.getFormat().getFont().setSize(16);
  chartTitle.getFormat().getFont().setBold(true);
  chartTitle.getFormat().getFont().setColor("#2C3E50");
  
  // Customize legend.
  const legend = chart.getLegend();
  legend.setPosition(ExcelScript.ChartLegendPosition.bottom);
  legend.getFormat().getFont().setSize(10);
  legend.setVisible(true);
  
  // Customize axes.
  const valueAxis = chart.getAxes().getValueAxis();
  valueAxis.setDisplayUnit(ExcelScript.ChartAxisDisplayUnit.thousands);
  valueAxis.getMajorGridlines().getFormat().getLine().setColor("#D3D3D3");
  valueAxis.getTitle().setText("Amount (in thousands)");
  
  const categoryAxis = chart.getAxes().getCategoryAxis();
  categoryAxis.getTitle().setText("Month");
  
  // Customize series.
  const series = chart.getSeries();
  series[0].getFormat().getFill().setSolidColor("#3498DB"); // Revenue - Blue.
  series[1].getFormat().getFill().setSolidColor("#E74C3C"); // Expenses - Red.
  
  // Set chart size.
  chart.setHeight(300);
  chart.setWidth(500);
}

See also