Help Text: Select a method to run BOM calculation. This will determine how cost contributions of the components should be calculated or applied.
Style: ComboBox
Values
| Name | Value | Description |
|---|---|---|
| MultiLevel | 0 | Multilevel |
| MakeToOrder | 1 | Make to order |
| SingleLevel | 2 | Single level |
| AccordingBOMLineType | 3 | According to BOM line type |